LR

Lincs Renewables

Lincolnshire's family-run MCS and NICEIC certified solar, battery, and EV charger specialists

Lincoln, UK
4.9 (10 reviews)
Verified
Residential Commercial Industrial

2026+

Years in Business

0

10

Customer Reviews

80 km

Service Area

2-10

Employees

SurgePV Score

8.7 / 10
Customer Reviews
98%
Certifications
90%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
50%

About Lincs Renewables

Lincs Renewables Ltd is a family-run renewable energy company based in Caistor, North Lincolnshire, serving Lincolnshire and East Yorkshire. The company can be contacted on 01472 511487 and its website is at lincsrenewables.co.uk. Lincs Renewables holds MCS and NICEIC accreditations and is a RECC member, meaning its operations are subject to independent audit and its customers are protected by the Renewable Energy Consumer Code.

The company provides domestic, commercial, and agricultural solar panel installations, battery storage systems, EV chargers, and ongoing maintenance and repair services. Lincs Renewables works across a wide area from its North Lincolnshire base, covering Lincoln, Grimsby, Scunthorpe, Hull, Caistor, and Louth.

Customer reviews highlight the professionalism of the team — led by Tom and colleagues — and note that requests are handled promptly and without fuss. Multiple reviewers have had full solar, battery, and EV charger packages installed in a single project, and post-installation support is consistently praised. As a family-run operation, Lincs Renewables offers the personal attention and accountability that customers in rural Lincolnshire often value over a larger national operator.

Service Area

Lincs Renewables serves the following areas within a 80 km radius:

LincolnGrimsbyScunthorpeHullCaistorLouth

Are you Lincs Renewables?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance

Certifications & Accreditations

MCS NICEIC RECC

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.9

10 reviews

Verified Customer

1 September 2024
Verified Customer

We couldn't fault the team. Very happy with our panels and batteries, installed very professionally with excellent follow-up service.

Verified Customer

15 June 2024
Verified Customer

Tom and the team installed the panels and batteries along with an EV charger. Very professional and polite. Nothing was too much trouble — would definitely recommend.

Frequently Asked Questions About Lincs Renewables

What services does Lincs Renewables offer?

Lincs Renewables offers Solar Installation, Battery Storage, EV Charging, Maintenance.

Is Lincs Renewables MCS certified?

Yes, Lincs Renewables is MCS certified and also holds NICEIC, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Lincs Renewables serve?

Lincs Renewables serves Lincoln, Grimsby, Scunthorpe, Hull, Caistor, Louth. They are based in Lincoln with a service radius of 80 km.

What warranty does Lincs Renewables offer?

Lincs Renewables offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Lincs Renewables's customer reviews?

Lincs Renewables has a 4.9/5 rating based on 10 customer reviews. Customers consistently rate them highly.

How long has Lincs Renewables been in business?

Lincs Renewables was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Lincs Renewables

Fill in your details and we'll connect you with Lincs Renewables.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote