MS

Mack Solar

Sheffield solar specialists backed by over two decades of construction experience

Sheffield, UK
4.5 (26 reviews)
Verified
Residential Commercial

6+

Years in Business

26

Customer Reviews

50 km

Service Area

2-10

Employees

SurgePV Score

8.1 / 10
Customer Reviews
90%
Certifications
100%
Experience
70%
Services Range
75%
Warranty Coverage
60%
Online Presence
75%

About Mack Solar

Mack Solar is a Sheffield-based solar installation company operating from 55 Wollaton Road, Bradway, Sheffield, S17 4HY. The company is backed by over two decades of construction experience through its parent company Mack Construction, bringing a level of structural and building expertise that distinguishes it from installers without a construction background. Mack Solar serves homeowners, commercial properties, and businesses across South Yorkshire, North Derbyshire, Hope Valley, and North Nottinghamshire.

The company holds MCS, NAPIT, TrustMark, RECC, and FMB (Federation of Master Builders) accreditations. All installations come with a 10-year insurance-backed guarantee and a 25-year performance warranty on panels. Mack Solar exclusively installs top-tier solar panels and offers battery storage solutions alongside their PV installations.

Across review platforms, the combined Mack Solar and Mack Construction business holds a 4.5-star rating from 26 reviews on Birdeye. Customers praise the team for their honest advice, technical knowledge, professional workmanship, and tidy site practices. The company’s deep roots in the Sheffield construction industry and local reputation provide customers with confidence in both the structural integrity and electrical quality of their solar installations.

Service Area

Mack Solar serves the following areas within a 50 km radius:

SheffieldRotherhamChesterfieldHope ValleyWorksop

Are you Mack Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS NAPIT TrustMark RECC FMB

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

10 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.5

26 reviews

Verified Customer

10 June 2025
Verified Customer

All the staff very polite and Robin was able to advise us on the best system to suit our roof space.

Verified Customer

22 April 2025
Verified Customer

Honest, straightforward, technically astute not only about solar power but also about mechanical engineering and construction.

Verified Customer

18 February 2025
Verified Customer

Excellent service. Extremely professional and thorough. Everything was done when they promised and the job was done very cleanly.

Frequently Asked Questions About Mack Solar

What services does Mack Solar offer?

Mack Solar offers Solar Installation, Battery Storage, Maintenance.

Is Mack Solar MCS certified?

Yes, Mack Solar is MCS certified and also holds NAPIT, TrustMark, RECC, FMB certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Mack Solar serve?

Mack Solar serves Sheffield, Rotherham, Chesterfield, Hope Valley, Worksop. They are based in Sheffield with a service radius of 50 km.

What warranty does Mack Solar offer?

Mack Solar offers 25-year panel warranty, 10-year inverter warranty, and 10-year installation/workmanship warranty.

How are Mack Solar's customer reviews?

Mack Solar has a 4.5/5 rating based on 26 customer reviews. Customers consistently rate them highly.

How long has Mack Solar been in business?

Mack Solar was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Mack Solar

Fill in your details and we'll connect you with Mack Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote