MS

Michigan Solar Solutions

Michigan's trusted solar installer since 2007 with NABCEP-certified in-house crews and 2,500+ completed projects

Detroit, Michigan
4.8 (280 reviews)
Verified
Residential Commercial Industrial

19+

Years in Business

2,500+

Projects Completed

280

Customer Reviews

124 mi

Service Area

11-50

Employees

SurgePV Score

9.2 / 10
Customer Reviews
96%
Certifications
75%
Experience
100%
Services Range
100%
Warranty Coverage
80%
Online Presence
100%

About Michigan Solar Solutions

Michigan Solar Solutions is a locally owned solar company founded in 2007 by Mark Hagerty, with offices in Commerce Township and Riverdale serving the entire lower peninsula of Michigan. The company is an end-to-end solar provider with all installations handled by an in-house team of NABCEP-certified professionals. Michigan Solar Solutions has completed more than 2,500 residential, commercial, and agricultural solar projects across the state.

The company installs panels from Solaria, Jinko Solar, and SolarWorld, paired with string and micro inverters from SolarEdge, Enphase, and SMA. Battery storage options include Tesla Powerwall, Enphase, Sol-Ark, and Outback Power systems. All panels installed by Michigan Solar Solutions feature the highest Michigan content of materials available, and the company offers a ten-year workmanship warranty alongside manufacturer warranties extending up to 25 years.

Michigan Solar Solutions maintains an A+ rating with the Better Business Bureau and a 4.8-star average across 280 Google reviews. The company has earned recognition as one of the top-rated solar installers in Michigan from EnergySage and EcoWatch. Their Southeast Michigan office in Commerce Township serves the Metro Detroit area, while the Central Michigan office in Riverdale covers the northern regions of the lower peninsula.

Service Area

Michigan Solar Solutions serves the following areas within a 124-mile radius:

DetroitCommerce TownshipAnn ArborWixomNoviFarmington HillsLansingGrand RapidsTraverse CityMidland

Are you Michigan Solar Solutions?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Monitoring
Maintenance
Commercial Solar

Certifications & Accreditations

NABCEP BBB A+ Rating

Partner Manufacturers

Panels

SolariaJinko SolarSolarWorld

Inverters

SolarEdgeEnphaseSMA

Batteries

Tesla PowerwallEnphaseSol-ArkOutback Power

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

280 reviews

Patricia L.

5 October 2025
Verified Customer

Michigan Solar Solutions designed a 12 kW system for our home in Novi. The in-house installation crew was professional and thorough. We appreciated that they handled every detail from permits to utility interconnection. System has been running flawlessly for six months.

Kevin B.

14 June 2025
Verified Customer

We went with MSS after comparing four quotes because they were the only company with NABCEP-certified installers doing the actual work. No subcontractors. The quality of the installation is excellent, and our energy bill went from $210 to about $15 per month.

Sandra M.

28 February 2025
Verified Customer

Overall a positive experience. The design and installation were top quality. The only reason I am not giving five stars is the scheduling took a bit longer than originally quoted, but the team communicated well about the delays.

Frequently Asked Questions About Michigan Solar Solutions

What services does Michigan Solar Solutions offer?

Michigan Solar Solutions offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Monitoring, Maintenance, Commercial Solar.

Is Michigan Solar Solutions NABCEP certified?

Yes, Michigan Solar Solutions is NABCEP certified and also holds BBB A+ Rating certification. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Michigan Solar Solutions serve?

Michigan Solar Solutions serves Detroit, Commerce Township, Ann Arbor, Wixom, Novi, Farmington Hills, Lansing, Grand Rapids and 2 other areas. They are based in Detroit with a service radius of 200 km.

What warranty does Michigan Solar Solutions offer?

Michigan Solar Solutions offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Michigan Solar Solutions's customer reviews?

Michigan Solar Solutions has a 4.8/5 rating based on 280 customer reviews. Customers consistently rate them highly.

How long has Michigan Solar Solutions been in business?

Michigan Solar Solutions was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Michigan Solar Solutions

Fill in your details and we'll connect you with Michigan Solar Solutions.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote