MS

Mirasol Solar

Family-owned solar contractor since 1977 with over 30,000 customers across Florida

Sarasota, Florida
4.9 (18 reviews)
Verified
Residential Commercial

49+

Years in Business

0

18

Customer Reviews

75 mi

Service Area

11-50

Employees

SurgePV Score

9.4 / 10
Customer Reviews
98%
Certifications
100%
Experience
100%
Services Range
75%
Warranty Coverage
80%
Online Presence
100%

About Mirasol Solar

Mirasol Solar is a family-owned solar energy company headquartered at 5638 Jason Lee Place, Sarasota, FL 34233. Founded in 1977, the company is one of the longest-operating solar contractors in Florida with over 30,000 customers served and more than four decades of experience in residential and commercial solar installations.

The company holds State Certified Solar Contractor and Plumbing Contractor licenses, and is a SunPower Authorized Dealer, Tesla Powerwall Certified Installer, FAFCO Authorized Distributor, CoolPV Certified Installer, sonnen Certified Installer, and has been selected by both REC and Maxeon Solar Technologies to represent their products. Mirasol handles all work in-house without subcontractors, covering system design, permitting, installation, and maintenance.

Mirasol Solar has a 4.9-star rating on Yelp from 18 reviews, a 4.4-star rating on Angi, and 94% of Facebook reviewers recommend the company. The company installs panels from SunPower, Maxeon, and REC alongside Tesla Powerwall and sonnen battery storage systems for both residential and commercial customers across the Sarasota and Southwest Florida region.

Service Area

Mirasol Solar serves the following areas within a 75-mile radius:

SarasotaBradentonVeniceNorth PortNokomisOspreyLakewood Ranch

Are you Mirasol Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

State Certified Solar Contractor State Certified Plumbing Contractor SunPower Authorized Dealer Tesla Powerwall Certified Installer REC Certified Installer

Partner Manufacturers

Panels

SunPowerMaxeonREC

Batteries

Tesla Powerwallsonnen

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

18 reviews

Verified Customer

5 September 2025
Verified Customer

Mirasol Solar did an outstanding job on our solar panel installation. Their team was professional, on time, and answered every question we had. Highly recommended.

Verified Customer

28 June 2025
Verified Customer

We chose Mirasol for their nearly 50 years of experience and it showed. Clean installation, no surprises, and the system is producing exactly what was quoted.

Verified Customer

12 April 2025
Verified Customer

Family-owned business that treats customers like family. The Tesla Powerwall integration was seamless and has already saved us during a power outage.

Frequently Asked Questions About Mirasol Solar

What services does Mirasol Solar offer?

Mirasol Solar offers Solar Installation, Battery Storage, Maintenance.

Is Mirasol Solar NABCEP certified?

Mirasol Solar holds the following certifications: State Certified Solar Contractor, State Certified Plumbing Contractor, SunPower Authorized Dealer, Tesla Powerwall Certified Installer, REC Certified Installer. Contact them directly for the latest accreditation details.

What areas does Mirasol Solar serve?

Mirasol Solar serves Sarasota, Bradenton, Venice, North Port, Nokomis, Osprey, Lakewood Ranch. They are based in Sarasota with a service radius of 120 km.

What warranty does Mirasol Solar offer?

Mirasol Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Mirasol Solar's customer reviews?

Mirasol Solar has a 4.9/5 rating based on 18 customer reviews. Customers consistently rate them highly.

How long has Mirasol Solar been in business?

Mirasol Solar was founded in 1977 and has been in business for 49 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Mirasol Solar

Fill in your details and we'll connect you with Mirasol Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote