Momentum Solar
National residential solar installer with a dedicated Birmingham office and flexible financing options
17+
Years in Business
200
Customer Reviews
93 mi
Service Area
201-500
Employees
SurgePV Score
About Momentum Solar
Momentum Solar is a national residential solar installer with a dedicated Birmingham, Alabama office at 1200 Corporate Drive, Suite 300. Founded in 2009 and headquartered in South Plainfield, New Jersey, the company has grown to serve homeowners across multiple states. The Birmingham office provides local project management, consultation, and customer support for Alabama residents interested in rooftop solar.
Momentum Solar offers a range of financing options including solar loans, leases, and power purchase agreements to make solar accessible to homeowners at various budget levels. The company handles every step of the process from initial home energy assessment through system design, permitting, installation, and utility interconnection with Alabama Power.
The Birmingham office is open Monday through Friday from 8am to 9pm and Saturday from 9am to 8pm, giving customers flexible scheduling for consultations. Momentum Solar maintains a presence across review platforms with over 200 customer reviews. The company offers free home solar assessments and provides detailed proposals showing expected energy production, savings, and return on investment for Birmingham-area homes.
Service Area
Momentum Solar serves the following areas within a 93-mile radius:
Contact Information
Are you Momentum Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4
200 reviews
Verified Customer
Momentum Solar made the switch to solar affordable with their financing options. The Birmingham team was responsive and the installation crew completed the job in one day. Our first full month showed a 70% reduction in our electricity bill.
Verified Customer
Good overall experience with Momentum Solar. The sales process was straightforward and the installation team was professional. The monitoring system works well and shows production data clearly.
Verified Customer
We appreciated having a local Birmingham office to visit. The permitting process took about six weeks, which is standard for our area. The system is now up and running and performing as expected.
Frequently Asked Questions About Momentum Solar
What services does Momentum Solar offer?
Momentum Solar offers Solar Installation, Solar Design, Monitoring.
Is Momentum Solar NABCEP certified?
Momentum Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Momentum Solar serve?
Momentum Solar serves Birmingham, Hoover, Vestavia Hills, Homewood, Mountain Brook, Trussville, Pelham. They are based in Birmingham with a service radius of 150 km.
What warranty does Momentum Solar offer?
Momentum Solar offers 25-year panel warranty, and 10-year installation/workmanship warranty.
How are Momentum Solar's customer reviews?
Momentum Solar has a 4/5 rating based on 200 customer reviews. They are well-regarded by their customers.
How long has Momentum Solar been in business?
Momentum Solar was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Birmingham
Get a Free Solar Quote from Momentum Solar
Fill in your details and we'll connect you with Momentum Solar.
Quote request sent!
Momentum Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile