Moulton Solar
MCS and RECC certified solar panel, battery storage, and EV charging specialists serving Northamptonshire
2026+
Years in Business
50 km
Service Area
1-10
Employees
SurgePV Score
About Moulton Solar
Moulton Solar is a Northampton-based solar panel installation company operating from Moulton Park Business Centre, Redhouse Road, Northamptonshire. The company is MCS certified and RECC (Renewable Energy Consumer Code) certified, meaning all installations meet the microgeneration quality standard and customers benefit from consumer code protections.
The company specialises in residential and commercial solar PV systems, battery storage, and EV charging point installation. Moulton Solar serves the whole of Northamptonshire including Northampton town, Daventry, Wellingborough, Kettering, and surrounding villages. Customers can reach the team on 01604 389000 or 01604 935055, or by email at [email protected].
Moulton Solar positions itself as a company that is “small enough for personal service yet big enough to secure wholesale panel prices.” This means customers get direct contact with qualified engineers throughout the project, from the initial roof survey through to system commissioning. The team is fully qualified in electrical installations and in solar PV and battery storage systems.
The company also installs EV charging stations for homeowners and businesses across Northamptonshire. All solar and battery storage installations are registered with the MCS, which is required to access the Smart Export Guarantee (SEG) — the UK scheme through which homeowners can be paid for surplus electricity exported to the grid.
Customer feedback consistently highlights the straightforward quoting process, clear communication on costs and expected energy savings, and professional installation teams. Finance options are available through third-party providers to spread the cost of installation.
Service Area
Moulton Solar serves the following areas within a 50 km radius:
Contact Information
Are you Moulton Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
No reviews yet.
Frequently Asked Questions About Moulton Solar
What services does Moulton Solar offer?
Moulton Solar offers Solar Installation, Battery Storage, EV Charging.
Is Moulton Solar MCS certified?
Yes, Moulton Solar is MCS certified and also holds RECC certification. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Moulton Solar serve?
Moulton Solar serves Northampton, Daventry, Wellingborough, Kettering, Towcester. They are based in Northampton with a service radius of 50 km.
What warranty does Moulton Solar offer?
Moulton Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Moulton Solar's customer reviews?
Moulton Solar does not have any reviews yet. Be the first to leave a review after using their services.
How long has Moulton Solar been in business?
Moulton Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Northampton
Get a Free Solar Quote from Moulton Solar
Fill in your details and we'll connect you with Moulton Solar.
Quote request sent!
Moulton Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile