MS

Mr Solar PV

MCS certified solar PV, battery storage and EV charging specialist across Norfolk and Suffolk since 2022

Norwich, UK
4.9 (69 reviews)
Verified
Residential Commercial

4+

Years in Business

0

69

Customer Reviews

60 km

Service Area

1-10

Employees

SurgePV Score

7.3 / 10
Customer Reviews
98%
Certifications
60%
Experience
70%
Services Range
90%
Warranty Coverage
63%
Online Presence
25%

About Mr Solar PV

Mr Solar PV is a Norwich and Norfolk-based solar installer with offices at Rouen House, Rouen Road, Norwich, NR1 1RB, and a second base at the Beacon Innovation Centre, Camelot Road, Gorleston-on-Sea, Great Yarmouth, NR31 7RA. The company has been operating as a trusted, MCS-certified solar installer serving homeowners and businesses across Norfolk and Suffolk since 2022.

The company provides a comprehensive solar energy service covering solar PV system installation, home battery storage, EV charge point installation, inverter upgrades for existing systems, and ongoing maintenance and monitoring. Both residential and commercial customers are served across the Norfolk and Suffolk region.

Mr Solar PV holds a 4.9-star rating on Trustpilot, reflecting consistent high performance across its customer base since founding. The company handles all technical and administrative aspects of a solar project — from the initial site assessment and custom system design through to DNO notification, MCS certification, and Smart Export Guarantee registration.

Customer feedback highlights the team’s clear explanation of the installation process, competitive pricing, and professional conduct throughout. Mr Solar PV positions itself as a specialist solar company, with the team’s technical focus on renewable energy meaning customers receive dedicated expertise rather than a generalist contractor.

The Norwich office can be reached on 01603 394104. The Great Yarmouth office is available on 01493 289118. Customers can also request a quote through the company’s website.

Service Area

Mr Solar PV serves the following areas within a 60 km radius:

NorwichNorfolkSuffolkGreat YarmouthGorleston

Are you Mr Solar PV?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance

Certifications & Accreditations

MCS

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Mr Solar PV

What services does Mr Solar PV offer?

Mr Solar PV offers Solar Installation, Battery Storage, EV Charging, Maintenance.

Is Mr Solar PV MCS certified?

Yes, Mr Solar PV is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Mr Solar PV serve?

Mr Solar PV serves Norwich, Norfolk, Suffolk, Great Yarmouth, Gorleston. They are based in Norwich with a service radius of 60 km.

What warranty does Mr Solar PV offer?

Mr Solar PV offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Mr Solar PV's customer reviews?

Mr Solar PV has a 4.9/5 rating based on 69 customer reviews. Customers consistently rate them highly.

How long has Mr Solar PV been in business?

Mr Solar PV was founded in 2022 and has been in business for 4 years. They are a newer entrant in the solar installation market.

Get a Free Solar Quote from Mr Solar PV

Fill in your details and we'll connect you with Mr Solar PV.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote