National Solar
Oregon's award-winning solar installer with 17 years of experience and 3,500+ families powered across the state
17+
Years in Business
3,500+
Projects Completed
14
Customer Reviews
124 mi
Service Area
11-50
Employees
SurgePV Score
About National Solar
National Solar is a solar installation company headquartered at 2709 NW Crossing Drive in Bend, Oregon, serving 22 locations across the state including Eugene. Founded in 2009, National Solar has over 17 years of experience and has powered more than 3,500 families with solar panels and battery storage systems.
The company installs REC Group solar panels alongside Generac PWRcell battery storage and Generac Power Systems generators. National Solar provides a full in-house team that handles system design, engineering, permitting, installation, and post-installation support. The company is an Energy Trust of Oregon Trade Ally Contractor and was awarded best quality, customer service, and performance as a Trade Ally in 2025.
National Solar holds a BBB A+ rating and has been BBB-accredited since 2018. The company was voted Bend’s number one solar company in 2024 and 2025, and maintains a 4.8-star rating on Google. National Solar serves Eugene and surrounding Lane County communities with the same level of service as its Bend headquarters.
Service Area
National Solar serves the following areas within a 124-mile radius:
Contact Information
Are you National Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
14 reviews
Lisa T.
National Solar handled everything from design to permitting to installation. Their Bend-based team served our Eugene home professionally and efficiently.
Richard P.
Award-winning solar company for good reason. The system is producing above estimates and the customer service has been outstanding.
Amy N.
Good overall experience. System was installed on schedule and performing well. The battery backup gives us peace of mind during outages.
Frequently Asked Questions About National Solar
What services does National Solar offer?
National Solar offers Solar Installation, Battery Storage, Solar Design, Grid Connection, Maintenance.
Is National Solar NABCEP certified?
National Solar holds the following certifications: Energy Trust of Oregon Trade Ally, BBB A+ Rating, Oregon Contractor License. Contact them directly for the latest accreditation details.
What areas does National Solar serve?
National Solar serves Eugene, Bend, Portland, Salem, Corvallis, Medford. They are based in Eugene with a service radius of 200 km.
What warranty does National Solar offer?
National Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are National Solar's customer reviews?
National Solar has a 4.8/5 rating based on 14 customer reviews. Customers consistently rate them highly.
How long has National Solar been in business?
National Solar was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Eugene
Get a Free Solar Quote from National Solar
Fill in your details and we'll connect you with National Solar.
Quote request sent!
National Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile