Neil Kelly Solar
Division of Portland's iconic Neil Kelly Company, offering solar since 2013 with B Corp certification
13+
Years in Business
30
Customer Reviews
50 mi
Service Area
51-100
Employees
SurgePV Score
About Neil Kelly Solar
Neil Kelly Solar is the solar division of Neil Kelly Company, one of Portland’s most established home services firms, originally founded in 1947 by Neil B. Kelly. The solar division was created in 2013 when the company acquired Mr. Sun Solar, bringing solar expertise under the Neil Kelly umbrella. The company is headquartered at 804 N Alberta Street in Portland.
Neil Kelly Solar provides residential and commercial solar PV installations and battery storage systems across the Portland metro area. As a division of a larger remodeling and construction company, Neil Kelly Solar benefits from deep expertise in roofing, electrical, and structural work, which enables seamless coordination between solar installation and any necessary home upgrades.
The company is a certified B Corporation and maintains an A+ BBB rating. Neil Kelly Solar holds a 4.6-star rating on Angi and strong ratings on GuildQuality. The company’s nearly 80-year legacy in Portland home services provides customers with confidence in long-term warranty support and company stability. Complimentary solar consultations are available by phone or through the website.
Service Area
Neil Kelly Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Neil Kelly Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.6
30 reviews
Alberta Arts Homeowner
We just completed a solar installation with Neil Kelly. We have worked with them previously and continue to be pleased in every way.
Hillsboro Customer
Great quality service, product, execution and follow-up. Neil Kelly's decades of contracting experience shows in the professionalism of their solar division.
Lake Oswego Resident
Solid installation from a company with a long Portland legacy. Pricing is fair for the quality of work and materials used.
Frequently Asked Questions About Neil Kelly Solar
What services does Neil Kelly Solar offer?
Neil Kelly Solar offers Solar Installation, Battery Storage, system_design.
Is Neil Kelly Solar NABCEP certified?
Neil Kelly Solar holds the following certifications: B Corporation, BBB Accredited. Contact them directly for the latest accreditation details.
What areas does Neil Kelly Solar serve?
Neil Kelly Solar serves Portland, Beaverton, Lake Oswego, Tigard, Hillsboro. They are based in Portland with a service radius of 80 km.
What warranty does Neil Kelly Solar offer?
Neil Kelly Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Neil Kelly Solar's customer reviews?
Neil Kelly Solar has a 4.6/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has Neil Kelly Solar been in business?
Neil Kelly Solar was founded in 2013 and has been in business for 13 years. They are one of the more experienced solar installers in their area.
Similar Installers in Portland
Get a Free Solar Quote from Neil Kelly Solar
Fill in your details and we'll connect you with Neil Kelly Solar.
Quote request sent!
Neil Kelly Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile