NC

North Coast Solar

Michigan's only certified Solar Insure and Pearl Certification installer with statewide coverage

Detroit, Michigan
4.8 (120 reviews)
Verified
Residential Commercial

6+

Years in Business

500+

Projects Completed

120

Customer Reviews

124 mi

Service Area

11-50

Employees

SurgePV Score

8.9 / 10
Customer Reviews
96%
Certifications
90%
Experience
70%
Services Range
100%
Warranty Coverage
100%
Online Presence
75%

About North Coast Solar

North Coast Solar is a Michigan-based solar installation company headquartered in Davison, operating under the North Coast Home Services brand. The company covers approximately 100% of Michigan, including the Detroit metropolitan area, Grand Rapids, Flint, Lansing, and Saginaw. North Coast Solar distinguishes itself as the only certified solar installer in Michigan to provide both Solar Insure coverage and a Pearl Certification with every installation.

The Solar Insure program, backed by Zurich North America, provides a 30-year parts and labor warranty on all systems installed by North Coast Solar, one of the longest workmanship warranties available from any Michigan installer. The Pearl Certification documents the home’s energy improvements in a way that is recognized by real estate appraisers and lenders, potentially increasing home resale value. North Coast Solar also provides electrical services, generator installation, and roofing through its parent company.

North Coast Solar holds an A+ rating with the Better Business Bureau and has earned consistently positive customer reviews for professionalism, transparent pricing, and installation quality. The company is licensed, bonded, and insured, and operates Monday through Saturday from its Davison office on East Atherton Road, serving clients across southeastern and central Michigan.

Service Area

North Coast Solar serves the following areas within a 124-mile radius:

DetroitDavisonFlintGrand RapidsWarrenSterling HeightsLansingAnn ArborTroySaginaw

Are you North Coast Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Monitoring
Maintenance
Roof Assessment
electrical_services
generators

Certifications & Accreditations

Solar Insure Certified Pearl Certification BBB A+ Rating

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

30 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

120 reviews

Christopher W.

25 September 2025
Verified Customer

North Coast Solar handled our installation from start to finish. The 30-year Solar Insure warranty and Pearl Certification were major factors in our decision. The crew was professional, cleaned up thoroughly, and the system is performing above projections.

Diana R.

10 May 2025
Verified Customer

We compared quotes from several Michigan solar companies and North Coast offered the best combination of warranty coverage and fair pricing. The installation took two days and everything was explained clearly. Our electric bill is now almost zero.

Steven B.

8 January 2025
Verified Customer

Good experience overall. The team was knowledgeable and the installation quality is excellent. The Pearl Certification is a nice bonus for home value. Minor scheduling delays due to weather, but they kept us updated throughout.

Frequently Asked Questions About North Coast Solar

What services does North Coast Solar offer?

North Coast Solar offers Solar Installation, Battery Storage, Solar Design, Monitoring, Maintenance, Roof Assessment, electrical_services, generators.

Is North Coast Solar NABCEP certified?

North Coast Solar holds the following certifications: Solar Insure Certified, Pearl Certification, BBB A+ Rating. Contact them directly for the latest accreditation details.

What areas does North Coast Solar serve?

North Coast Solar serves Detroit, Davison, Flint, Grand Rapids, Warren, Sterling Heights, Lansing, Ann Arbor and 2 other areas. They are based in Detroit with a service radius of 200 km.

What warranty does North Coast Solar offer?

North Coast Solar offers 25-year panel warranty, 25-year inverter warranty, and 30-year installation/workmanship warranty.

How are North Coast Solar's customer reviews?

North Coast Solar has a 4.8/5 rating based on 120 customer reviews. Customers consistently rate them highly.

How long has North Coast Solar been in business?

North Coast Solar was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.

Get a Free Solar Quote from North Coast Solar

Fill in your details and we'll connect you with North Coast Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote