NS

Northern Solar

Merseyside's pioneering solar company, installing since 2006

Liverpool, UK
4.6 (28 reviews)
Verified
Residential Commercial

20+

Years in Business

28

Customer Reviews

60 km

Service Area

2-10

Employees

SurgePV Score

7.7 / 10
Customer Reviews
92%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
53%
Online Presence
50%

About Northern Solar

Northern Solar was established in 2006 as the first Solar PV company in Merseyside and the second in the North West of England. Operating from their office on Breckfield Road South in Liverpool, the company has nearly two decades of experience in designing, supplying, and installing solar PV systems for homes and businesses across the region. Northern Solar holds MCS accreditation, qualifying all installations for Smart Export Guarantee payments.

As a pioneer in the Merseyside solar market, Northern Solar has built a reputation for technical expertise and reliable installations. The company handles both residential and commercial projects, from single-home rooftop arrays to larger business installations. Their team provides system design, installation, and ongoing maintenance services, with a focus on maximising energy generation for each property.

Northern Solar’s long track record in the industry means they bring practical experience with a wide range of roof types, panel technologies, and inverter configurations. Customer reviews consistently praise the company’s professionalism, clean installations, and willingness to explain system operation. The company serves Liverpool and the wider Merseyside area, including the Wirral, St Helens, and Warrington.

Service Area

Northern Solar serves the following areas within a 60 km radius:

LiverpoolMerseysideWirralSt HelensWarrington

Are you Northern Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

10 years

Installation Warranty

5 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.6

28 reviews

Margaret Collins

15 August 2025
Verified Customer

Thank you for the excellent service. At every stage in the process we were very impressed by the expertise and professionalism. The installation team were friendly, polite, and efficient.

Peter Jones

12 March 2025
Verified Customer

Northern Solar designed a system perfectly suited to our property. Great communication throughout and the panels have been producing well above the estimates.

Frequently Asked Questions About Northern Solar

What services does Northern Solar offer?

Northern Solar offers Solar Installation, Battery Storage, Maintenance.

Is Northern Solar MCS certified?

Yes, Northern Solar is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Northern Solar serve?

Northern Solar serves Liverpool, Merseyside, Wirral, St Helens, Warrington. They are based in Liverpool with a service radius of 60 km.

What warranty does Northern Solar offer?

Northern Solar offers 25-year panel warranty, 10-year inverter warranty, and 5-year installation/workmanship warranty.

How are Northern Solar's customer reviews?

Northern Solar has a 4.6/5 rating based on 28 customer reviews. Customers consistently rate them highly.

How long has Northern Solar been in business?

Northern Solar was founded in 2006 and has been in business for 20 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Northern Solar

Fill in your details and we'll connect you with Northern Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote