Orange Solar Systems
Family-run MCS-certified solar PV installer serving Southampton and Hampshire for over 15 years
16+
Years in Business
56
Customer Reviews
80 km
Service Area
2-10
Employees
SurgePV Score
About Orange Solar Systems
Orange Solar Systems Ltd is a family-owned solar energy company based at 65 Deacon Crescent, Bitterne, Southampton, SO19 7BS. With over 15 years of experience, they were among the first solar specialists in the Southampton area and have built a strong reputation across the South of England for residential and commercial solar PV installations.
The company holds MCS certification (Certificate Number COR/401) and NAPIT membership, confirming their installations meet rigorous industry standards and electrical safety regulations. Their services include solar PV panel design and installation, battery storage systems, and ongoing maintenance support. Orange Solar Systems offers free, no-obligation consultations and site assessments for homeowners and businesses looking to adopt solar energy.
Orange Solar Systems has earned a 4.7-star rating across review platforms from 56 customer reviews, with consistent praise for their no-pressure sales approach, professional installation work, and responsive after-sales support. As a local, family-run business, they are known for providing personalised service and creative system designs tailored to each property’s roof layout and energy requirements.
Service Area
Orange Solar Systems serves the following areas within a 80 km radius:
Contact Information
Are you Orange Solar Systems?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.7
56 reviews
Phil M
Very pleased with the whole process from first meeting to completion of the installation and subsequent follow-up. Happy to recommend Orange Solar Systems to others.
Sarah T
They were extremely professional, polite and helpful. They did not push me to buy and I felt very happy and safe.
James R
Consultant very friendly and thorough. Produced an imaginative solution, giving a better layout than anyone else.
Frequently Asked Questions About Orange Solar Systems
What services does Orange Solar Systems offer?
Orange Solar Systems offers Solar Installation, Battery Storage, Maintenance.
Is Orange Solar Systems MCS certified?
Yes, Orange Solar Systems is MCS certified and also holds NAPIT certification. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Orange Solar Systems serve?
Orange Solar Systems serves Southampton, Portsmouth, Winchester, Eastleigh, Fareham. They are based in Southampton with a service radius of 80 km.
What warranty does Orange Solar Systems offer?
Contact Orange Solar Systems directly for their current warranty terms.
How are Orange Solar Systems's customer reviews?
Orange Solar Systems has a 4.7/5 rating based on 56 customer reviews. Customers consistently rate them highly.
How long has Orange Solar Systems been in business?
Orange Solar Systems was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.
Similar Installers in Southampton
Get a Free Solar Quote from Orange Solar Systems
Fill in your details and we'll connect you with Orange Solar Systems.
Quote request sent!
Orange Solar Systems will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile