Palmetto Energy
National solar provider with 24/7 monitoring, NABCEP-certified installers, and comprehensive protection plans
17+
Years in Business
701
Customer Reviews
62 mi
Service Area
201-500
Employees
SurgePV Score
About Palmetto Energy
Palmetto Energy is a national solar provider established in 2013 and headquartered in Charleston, South Carolina, with operations spanning 19 states including Arizona. The company serves the greater Phoenix metropolitan area with a full-service approach that covers system design, installation, financing, and long-term monitoring. Palmetto holds an A+ BBB rating and NABCEP certification, and is a member of the Solar Energy Industries Association (SEIA).
The company installs residential solar systems using panels from Q Cells and REC, two brands that consistently rank among the top-performing modules in industry reviews. Inverter options include Enphase microinverters and SolarEdge optimizers, with Tesla Powerwall and Enphase IQ Battery available for energy storage. Palmetto’s proprietary app provides real-time monitoring of system production, consumption, and savings, along with remote diagnostics and service alerts.
A distinguishing feature of Palmetto’s offering is their Protect subscription plan, which provides 24/7 system monitoring, remote panel diagnosis, warranty coverage for roof leaks, manufacturing defects, inverter issues, and installation problems. The company carries a 4.7-star rating on EnergySage across 701 reviews. While some customers note that communication during the permitting phase could improve, the majority praise the quality of installation, the monitoring technology, and the reduction in their electricity bills.
Service Area
Palmetto Energy serves the following areas within a 62-mile radius:
Contact Information
Are you Palmetto Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
701 reviews
Michelle T.
Palmetto made going solar straightforward. The app lets me monitor production and consumption in real time. Our system has been running for six months with zero issues. The Protect plan gives us extra peace of mind.
Jason R.
Good experience overall. The installation quality was high and the system is performing well. The Palmetto app is useful for tracking energy production. Communication could have been slightly better during the permitting phase.
Linda W.
We appreciated that Palmetto handles the entire process and offers ongoing monitoring. The installation crew was professional and efficient. Our electric bills have dropped by about 85% since going solar.
Frequently Asked Questions About Palmetto Energy
What services does Palmetto Energy offer?
Palmetto Energy offers Solar Installation, Battery Storage, Monitoring, Maintenance, Solar Design, Energy Audit.
Is Palmetto Energy NABCEP certified?
Yes, Palmetto Energy is NABCEP certified and also holds BBB A+ Accredited, SEIA Member certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Palmetto Energy serve?
Palmetto Energy serves Phoenix, Scottsdale, Tempe, Mesa, Chandler, Gilbert, Glendale, Peoria and 2 other areas. They are based in Phoenix with a service radius of 100 km.
What warranty does Palmetto Energy offer?
Palmetto Energy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Palmetto Energy's customer reviews?
Palmetto Energy has a 4.7/5 rating based on 701 customer reviews. Customers consistently rate them highly.
How long has Palmetto Energy been in business?
Palmetto Energy was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Phoenix
Get a Free Solar Quote from Palmetto Energy
Fill in your details and we'll connect you with Palmetto Energy.
Quote request sent!
Palmetto Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile