PS

Parrot Solar

Tesla Premier Installer serving Jacksonville, Clay County, and St. Johns County since 2018

Jacksonville, Florida
4.3 (20 reviews)
Verified
Residential Commercial

8+

Years in Business

0

20

Customer Reviews

62 mi

Service Area

1-10

Employees

SurgePV Score

8.5 / 10
Customer Reviews
86%
Certifications
90%
Experience
85%
Services Range
100%
Warranty Coverage
63%
Online Presence
75%

About Parrot Solar

Parrot Solar is a Jacksonville-based solar installation company founded in November 2018, operating from 3099 Leon Road, Unit 5B, in Jacksonville. The company is a Tesla Premier Installer specializing in Tesla solar panels and Powerwall battery storage systems for residential and commercial clients in Clay County, St. Johns County, and the greater Jacksonville Beach area.

Parrot Solar holds Florida Certified Solar Contractor license CVC57072 and is BBB Accredited. The company uses high-quality Iron Ridge racking systems to support solar panel installations and focuses on customized system designs tailored to each property’s roof orientation, shading conditions, and energy consumption patterns. The owner provides hands-on involvement in system design and maintains direct communication with customers throughout the project.

Customers note the company’s dedication to integrity, affordable pricing, and attention to detail during installations. Parrot Solar’s focus on Tesla equipment means customers get a fully integrated solar and battery solution from a single manufacturer. The company serves Jacksonville, Jacksonville Beach, St. Augustine, Orange Park, Middleburg, Ponte Vedra Beach, and surrounding areas. Business hours are Monday through Saturday, 8 AM to 6 PM.

Service Area

Parrot Solar serves the following areas within a 62-mile radius:

JacksonvilleJacksonville BeachSt. AugustineOrange ParkMiddleburgPonte Vedra BeachFleming Island

Are you Parrot Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Grid Connection
Roof Assessment
Maintenance

Certifications & Accreditations

BBB A- Tesla Premier Installer FL Certified Solar Contractor CVC57072

Partner Manufacturers

Panels

Tesla

Inverters

Tesla

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.3

20 reviews

Carlos V.

15 September 2025
Verified Customer

Parrot Solar installed our Tesla panels and Powerwall system. The owner's technical knowledge was impressive and he took time to explain every aspect of the design. The installation was clean and professional.

Amanda S.

22 June 2025
Verified Customer

Affordable pricing and a customized installation that accounted for our specific roof layout and shading conditions. The team was dedicated to getting the design right before starting work.

John D.

8 March 2025
Verified Customer

Good quality installation with Tesla equipment. The timeline was slightly longer than initially quoted due to permitting delays, but the end result was worth the wait. System is producing well.

Frequently Asked Questions About Parrot Solar

What services does Parrot Solar offer?

Parrot Solar offers Solar Installation, Battery Storage, Solar Design, Grid Connection, Roof Assessment, Maintenance.

Is Parrot Solar NABCEP certified?

Parrot Solar holds the following certifications: BBB A-, Tesla Premier Installer, FL Certified Solar Contractor CVC57072. Contact them directly for the latest accreditation details.

What areas does Parrot Solar serve?

Parrot Solar serves Jacksonville, Jacksonville Beach, St. Augustine, Orange Park, Middleburg, Ponte Vedra Beach, Fleming Island. They are based in Jacksonville with a service radius of 100 km.

What warranty does Parrot Solar offer?

Parrot Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Parrot Solar's customer reviews?

Parrot Solar has a 4.3/5 rating based on 20 customer reviews. They are well-regarded by their customers.

How long has Parrot Solar been in business?

Parrot Solar was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Parrot Solar

Fill in your details and we'll connect you with Parrot Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote