PP

Peak Power Solar

NABCEP and UL certified Arkansas solar contractor serving residential and commercial clients statewide

Little Rock, Arkansas
4.5 (15 reviews)
Verified
Residential Commercial

5+

Years in Business

0

15

Customer Reviews

93 mi

Service Area

1-10

Employees

SurgePV Score

8.2 / 10
Customer Reviews
90%
Certifications
90%
Experience
70%
Services Range
60%
Warranty Coverage
80%
Online Presence
100%

About Peak Power Solar

Peak Power Solar is a solar installation contractor headquartered at 10515 W Markham St, Suite I4, Little Rock, AR 72205. Founded in 2021, the company holds NABCEP and UL certifications and is BBB accredited. Peak Power Solar provides residential and commercial solar installation, financing assistance, and solar repair and maintenance services.

The company serves the Little Rock metropolitan area and communities across Arkansas including Fort Smith, Fayetteville, Jonesboro, Russellville, Hot Springs, Mountain Home, Stuttgart, and Bentonville. Peak Power Solar operates Monday through Saturday from 6:00 AM to 6:00 PM.

Service Area

Peak Power Solar serves the following areas within a 93-mile radius:

Little RockNorth Little RockFort SmithFayettevilleJonesboroHot SpringsBentonville

Are you Peak Power Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Maintenance

Certifications & Accreditations

NABCEP Certified UL Certified BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

No reviews yet.

Frequently Asked Questions About Peak Power Solar

What services does Peak Power Solar offer?

Peak Power Solar offers Solar Installation, Maintenance.

Is Peak Power Solar NABCEP certified?

Peak Power Solar holds the following certifications: NABCEP Certified, UL Certified, BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Peak Power Solar serve?

Peak Power Solar serves Little Rock, North Little Rock, Fort Smith, Fayetteville, Jonesboro, Hot Springs, Bentonville. They are based in Little Rock with a service radius of 150 km.

What warranty does Peak Power Solar offer?

Peak Power Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Peak Power Solar's customer reviews?

Peak Power Solar has a 4.5/5 rating based on 15 customer reviews. Customers consistently rate them highly.

How long has Peak Power Solar been in business?

Peak Power Solar was founded in 2021 and has been in business for 5 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Peak Power Solar

Fill in your details and we'll connect you with Peak Power Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote