PS

Perfection Solar

Greenville-based solar installer providing residential, commercial, and off-grid solar panel solutions

Greenville, South Carolina
4.7 (10 reviews)
Residential Commercial off-grid

8+

Years in Business

0

10

Customer Reviews

50 mi

Service Area

1-10

Employees

SurgePV Score

6.7 / 10
Customer Reviews
94%
Certifications
0%
Experience
85%
Services Range
75%
Warranty Coverage
80%
Online Presence
75%

About Perfection Solar

Perfection Solar is a solar installation company located at 905 Pendleton St, Greenville, SC 29601, serving residential, commercial, and off-grid customers throughout the Upstate South Carolina region. The company installs photovoltaic solar panels and provides solar maintenance and repair services.

Perfection Solar handles the complete installation process from initial assessment and system design through permitting, installation, and utility interconnection. The company also offers off-grid solar solutions for customers seeking energy independence.

Perfection Solar operates Tuesday through Friday and Mondays, 8:00 AM to 5:00 PM, and provides free estimates for solar installations in the Greenville area.

Service Area

Perfection Solar serves the following areas within a 50-mile radius:

GreenvilleSpartanburgAndersonEasleySimpsonville

Are you Perfection Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

10 reviews

Verified Customer

10 August 2025
Verified Customer

Perfection Solar did a fantastic job on our residential installation. They were thorough in the design phase and the installation was clean and professional. The off-grid expertise was a bonus.

Verified Customer

5 June 2025
Verified Customer

Great company to work with. They took the time to explain all our options including battery storage. The installation crew was efficient and left the site spotless.

Verified Customer

20 March 2025
Verified Customer

Good experience overall. Fair pricing and quality workmanship. The system has been performing well since installation.

Frequently Asked Questions About Perfection Solar

What services does Perfection Solar offer?

Perfection Solar offers Solar Installation, Battery Storage, Maintenance.

Is Perfection Solar NABCEP certified?

Perfection Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Perfection Solar serve?

Perfection Solar serves Greenville, Spartanburg, Anderson, Easley, Simpsonville. They are based in Greenville with a service radius of 80 km.

What warranty does Perfection Solar offer?

Perfection Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Perfection Solar's customer reviews?

Perfection Solar has a 4.7/5 rating based on 10 customer reviews. Customers consistently rate them highly.

How long has Perfection Solar been in business?

Perfection Solar was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Perfection Solar

Fill in your details and we'll connect you with Perfection Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote