PlugPV
Personalized solar energy and battery storage solutions for Capital Region homeowners since 2017
9+
Years in Business
35
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About PlugPV
PlugPV is a residential solar energy and battery storage company based at 875 Broadway in Albany, NY. Founded in 2017, PlugPV provides personalized solar solutions for homeowners across the Capital Region, helping them reduce their energy costs and carbon footprint.
The company holds NABCEP certification and is a certified Tesla and Generac partner. PlugPV installs Enphase microinverter systems and offers Tesla Powerwall and Generac battery storage options. The company serves New York, Massachusetts, Vermont, Connecticut, New Jersey, Florida, New Hampshire, and Ohio.
PlugPV operates Monday through Saturday from 8 AM to 8 PM and provides free solar consultations. The company handles all aspects of the installation process including site assessment, system design, permitting, installation, and utility interconnection. PlugPV assists customers with New York State solar incentives, NYSERDA programs, and net metering setup.
Service Area
PlugPV serves the following areas within a 62-mile radius:
Contact Information
Are you PlugPV?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
35 reviews
Jessica W.
PlugPV made going solar easy. The team designed a system specific to our Albany home and handled everything from permits to utility paperwork. Our bills dropped immediately.
Mike T.
From sales to install, the PlugPV team was fantastic. They even stopped by after installation to drop off gift cards as a thank you. Great local company.
Rebecca N.
Professional installation and good follow-up. The system has been performing well since day one. Would recommend PlugPV to anyone in the Capital Region.
Frequently Asked Questions About PlugPV
What services does PlugPV offer?
PlugPV offers Solar Installation, Battery Storage, Solar Design, Monitoring.
Is PlugPV NABCEP certified?
Yes, PlugPV is NABCEP certified and also holds Tesla Certified Partner, Generac Partner certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does PlugPV serve?
PlugPV serves Albany, Troy, Schenectady, Saratoga Springs, Clifton Park, Latham. They are based in Albany with a service radius of 100 km.
What warranty does PlugPV offer?
PlugPV offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are PlugPV's customer reviews?
PlugPV has a 4.7/5 rating based on 35 customer reviews. Customers consistently rate them highly.
How long has PlugPV been in business?
PlugPV was founded in 2017 and has been in business for 9 years. They have solid experience in the solar industry.
Similar Installers in Albany
Get a Free Solar Quote from PlugPV
Fill in your details and we'll connect you with PlugPV.
Quote request sent!
PlugPV will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile