PS

Poulin Solar Pro

Top-rated New Mexico solar installer with 40+ years of construction experience and a dedicated Santa Fe office

Santa Fe, New Mexico
4.8 (137 reviews)
Verified
Residential Commercial

11+

Years in Business

0

137

Customer Reviews

62 mi

Service Area

11-50

Employees

SurgePV Score

7.8 / 10
Customer Reviews
96%
Certifications
60%
Experience
85%
Services Range
60%
Warranty Coverage
80%
Online Presence
75%

About Poulin Solar Pro

Poulin Solar Pro operates a Santa Fe office at 1300 Rufina Circle, Suite B-1, Santa Fe, NM 87507. Established in 2015 as a division of Poulin Design Center (founded 1982 by Tom Poulin), the company brings over 40 years of construction and remodeling experience to solar installations.

Poulin Solar Pro installs Q Cells solar panels with Enphase microinverters and maintains an A+ BBB rating. The company is consistently rated among the top solar installers in New Mexico, with over 137 reviews across platforms. They serve both residential and commercial clients from their Santa Fe and Albuquerque offices.

The company handles all aspects of the installation process, from initial site assessment and system design through permitting, installation, and utility interconnection.

Service Area

Poulin Solar Pro serves the following areas within a 62-mile radius:

Santa FeAlbuquerqueRio RanchoLos Lunas

Are you Poulin Solar Pro?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage

Certifications & Accreditations

BBB A+

Partner Manufacturers

Panels

Q Cells

Inverters

Enphase

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

137 reviews

Verified Customer

5 October 2025
Verified Customer

Poulin Solar Pro handled our Santa Fe installation with professionalism. The Q Cells panels and Enphase microinverters are performing well. Their parent company's decades of construction experience shows in the quality of the roof work.

Verified Customer

12 July 2025
Verified Customer

Great experience from consultation to final inspection. The team was responsive and completed the installation on schedule. Our energy bills have dropped significantly.

Verified Customer

18 April 2025
Verified Customer

Solid installation and competitive pricing. The permitting process took a bit longer than expected but that was the city, not Poulin. System is working great.

Frequently Asked Questions About Poulin Solar Pro

What services does Poulin Solar Pro offer?

Poulin Solar Pro offers Solar Installation, Battery Storage.

Is Poulin Solar Pro NABCEP certified?

Poulin Solar Pro holds the following certifications: BBB A+. Contact them directly for the latest accreditation details.

What areas does Poulin Solar Pro serve?

Poulin Solar Pro serves Santa Fe, Albuquerque, Rio Rancho, Los Lunas. They are based in Santa Fe with a service radius of 100 km.

What warranty does Poulin Solar Pro offer?

Poulin Solar Pro offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Poulin Solar Pro's customer reviews?

Poulin Solar Pro has a 4.8/5 rating based on 137 customer reviews. Customers consistently rate them highly.

How long has Poulin Solar Pro been in business?

Poulin Solar Pro was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Poulin Solar Pro

Fill in your details and we'll connect you with Poulin Solar Pro.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote