PR

Powerforce Renewables

MCS certified solar PV, battery storage and EV charger installers serving Southampton and the South Coast

Southampton, UK
0 (0 reviews)
Verified
Residential Commercial

3+

Years in Business

0

65 km

Service Area

1-10

Employees

SurgePV Score

5 / 10
Customer Reviews
0%
Certifications
100%
Experience
50%
Services Range
75%
Warranty Coverage
63%
Online Presence
25%

About Powerforce Renewables

Powerforce Renewables is a Hampshire-based sustainable energy company registered at The Willow, Grange Road, Netley Abbey, Southampton, SO31 5FF. Incorporated in December 2023, the company brings over 40 years of electrical installation experience and 10 years at the forefront of solar PV technology to domestic and commercial customers across the South Coast.

The company is MCS certified and an Octopus Energy approved installer. Powerforce Renewables holds RECC, TrustMark, and NICEIC accreditations, giving customers full confidence that installations meet UK industry quality standards. All work is carried out by their in-house team of qualified engineers.

Services cover the full renewable energy package: solar PV systems, home battery storage, EV chargers, and mobile sustainable energy solutions. Powerforce also works with businesses and organisations requiring commercial-scale renewable energy installations. Their service radius covers most of Hampshire and the wider South Coast within approximately 40 miles of Southampton.

Customer feedback highlights the team’s attention to detail and neat, professional installation work. Reviewers note that all equipment arrives on schedule, installations are completed with minimum disruption, and energy bills show meaningful reductions following system commissioning. The company provides case studies of completed domestic and commercial projects on its website, demonstrating the range and quality of its work.

Service Area

Powerforce Renewables serves the following areas within a 65 km radius:

SouthamptonPortsmouthWinchesterEastleighFareham

Contact Information

Are you Powerforce Renewables?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

MCS RECC TrustMark NICEIC

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

0

0 reviews

Verified Customer

1 October 2025
Verified Customer

Every install looks fantastic — attention to detail that is second to none. All kit arrived on time, fitted with minimum disruption, and our bills are significantly cheaper than before.

Frequently Asked Questions About Powerforce Renewables

What services does Powerforce Renewables offer?

Powerforce Renewables offers Solar Installation, Battery Storage, EV Charging.

Is Powerforce Renewables MCS certified?

Yes, Powerforce Renewables is MCS certified and also holds RECC, TrustMark, NICEIC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Powerforce Renewables serve?

Powerforce Renewables serves Southampton, Portsmouth, Winchester, Eastleigh, Fareham. They are based in Southampton with a service radius of 65 km.

What warranty does Powerforce Renewables offer?

Powerforce Renewables offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Powerforce Renewables's customer reviews?

Powerforce Renewables does not have any reviews yet. Be the first to leave a review after using their services.

How long has Powerforce Renewables been in business?

Powerforce Renewables was founded in 2023 and has been in business for 3 years. They are a newer entrant in the solar installation market.

Get a Free Solar Quote from Powerforce Renewables

Fill in your details and we'll connect you with Powerforce Renewables.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote