PG

Powerfully Green Solar

Full-service Minneapolis solar installer with 15+ years of experience and A+ BBB rating

Minneapolis, Minnesota
4.4 (80 reviews)
Verified
Residential Commercial

18+

Years in Business

80

Customer Reviews

62 mi

Service Area

11-50

Employees

SurgePV Score

8.8 / 10
Customer Reviews
88%
Certifications
75%
Experience
100%
Services Range
100%
Warranty Coverage
80%
Online Presence
75%

About Powerfully Green Solar

Powerfully Green Solar is a full-service solar energy installer based at 6701 W 23rd Street in Minneapolis. Founded in 2008, the company has been designing, selling, and installing residential and commercial solar systems across Minnesota for over 15 years. Powerfully Green manages every aspect of the solar process including system design, engineering, permitting, installation, performance monitoring, and ongoing maintenance support.

The company installs panels from REC and Silfab with Enphase and SolarEdge inverters and offers battery storage from Tesla Powerwall and Enphase. Powerfully Green Solar holds NABCEP certification and an A+ rating from the Better Business Bureau. The team has extensive knowledge of Minnesota’s solar incentive programs, utility net metering policies, and local permitting requirements across the Twin Cities metro area.

Powerfully Green Solar maintains a 4.4-star rating across review platforms with over 80 customer reviews. The company has earned recognition for its professionalism, timely installations, and competitive pricing. As a locally owned Minneapolis company with deep roots in the community, Powerfully Green offers personalized service and accountability that national solar companies cannot match.

Service Area

Powerfully Green Solar serves the following areas within a 62-mile radius:

MinneapolisSaint PaulSaint Louis ParkEdinaBloomingtonGolden ValleyRichfield

Are you Powerfully Green Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Monitoring
Maintenance
Commercial Solar

Certifications & Accreditations

NABCEP BBB A+ Accredited

Partner Manufacturers

Panels

RECSilfab

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.4

80 reviews

Jason B.

1 October 2025
Verified Customer

Powerfully Green Solar delivered exactly what they promised. The team was knowledgeable about Minnesota solar incentives and helped us maximize our savings. Installation was professional and the system has been producing consistently.

Rebecca T.

8 July 2025
Verified Customer

After getting quotes from five companies, we chose Powerfully Green for their competitive pricing and local reputation. They handled the entire process smoothly and our system went live in under six weeks.

Nathan C.

28 March 2025
Verified Customer

Good installation quality and fair pricing. Communication could have been slightly better during the permitting phase, but the end result is excellent. System performance has exceeded estimates in the summer months.

Frequently Asked Questions About Powerfully Green Solar

What services does Powerfully Green Solar offer?

Powerfully Green Solar offers Solar Installation, Battery Storage, Solar Design, Monitoring, Maintenance, Commercial Solar.

Is Powerfully Green Solar NABCEP certified?

Yes, Powerfully Green Solar is NABCEP certified and also holds BBB A+ Accredited certification. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Powerfully Green Solar serve?

Powerfully Green Solar serves Minneapolis, Saint Paul, Saint Louis Park, Edina, Bloomington, Golden Valley, Richfield. They are based in Minneapolis with a service radius of 100 km.

What warranty does Powerfully Green Solar offer?

Powerfully Green Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Powerfully Green Solar's customer reviews?

Powerfully Green Solar has a 4.4/5 rating based on 80 customer reviews. They are well-regarded by their customers.

How long has Powerfully Green Solar been in business?

Powerfully Green Solar was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Powerfully Green Solar

Fill in your details and we'll connect you with Powerfully Green Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote