PS

Prestige Solar Services

Solar panel installation, repair, and protection specialists serving Newark and the greater New Jersey area since 2019

Newark, New Jersey
4.7 (35 reviews)
Residential Commercial

7+

Years in Business

0

35

Customer Reviews

50 mi

Service Area

1-10

Employees

SurgePV Score

6.9 / 10
Customer Reviews
94%
Certifications
0%
Experience
70%
Services Range
90%
Warranty Coverage
80%
Online Presence
100%

About Prestige Solar Services

Prestige Solar Services LLC is a solar installation and maintenance company based at 497 Ocean Avenue in Jersey City, New Jersey. Founded in 2019, the company serves homeowners and commercial property owners across the Newark metro area and greater New Jersey. Prestige Solar specializes in new solar installations as well as repair, maintenance, and protection services for existing solar systems.

The company offers a range of specialized services beyond standard installation, including micro-inverter replacement, critter guard installation, drone-based solar panel inspection, and system performance optimization. This focus on the full lifecycle of a solar system, not just the initial installation, distinguishes Prestige from many competitors. The company works with customers to assess existing systems, identify underperformance issues, and restore panels to optimal production levels.

Prestige Solar Services has earned recognition from Expertise.com as one of the best solar companies serving the Newark area. The company maintains a 4.7-star rating across review platforms, with customers particularly praising the team’s expertise in solar repair and maintenance work. For Newark-area homeowners with existing solar systems that need servicing, Prestige offers a compelling combination of diagnostic capability and hands-on repair experience.

Service Area

Prestige Solar Services serves the following areas within a 50-mile radius:

NewarkJersey CityElizabethBayonneUnion CityMerchantvilleCamden

Are you Prestige Solar Services?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Maintenance
Monitoring
Roof Assessment

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

35 reviews

George A.

15 October 2025
Verified Customer

Prestige Solar replaced micro-inverters on our existing system that another company installed. They were knowledgeable, efficient, and their pricing was fair. The system is back to full production now.

Nicole B.

22 July 2025
Verified Customer

We hired Prestige for a new residential installation and they did an excellent job. The crew was on time, neat, and completed everything in one day. Great communication throughout the project.

William H.

10 April 2025
Verified Customer

Prestige installed critter guards and performed a full inspection of our solar panels using drone imaging. Found a couple of issues we did not know about. Fair pricing and professional service.

Frequently Asked Questions About Prestige Solar Services

What services does Prestige Solar Services offer?

Prestige Solar Services offers Solar Installation, Maintenance, Monitoring, Roof Assessment.

Is Prestige Solar Services NABCEP certified?

Prestige Solar Services holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Prestige Solar Services serve?

Prestige Solar Services serves Newark, Jersey City, Elizabeth, Bayonne, Union City, Merchantville, Camden. They are based in Newark with a service radius of 80 km.

What warranty does Prestige Solar Services offer?

Prestige Solar Services offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Prestige Solar Services's customer reviews?

Prestige Solar Services has a 4.7/5 rating based on 35 customer reviews. Customers consistently rate them highly.

How long has Prestige Solar Services been in business?

Prestige Solar Services was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Prestige Solar Services

Fill in your details and we'll connect you with Prestige Solar Services.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote