PT

Prime Time Solar

MCS and HIES certified solar panel installer serving Northamptonshire since 2010

Northampton, UK
0 (0 reviews)
Verified
Residential Commercial

16+

Years in Business

0

80 km

Service Area

11-50

Employees

SurgePV Score

5.8 / 10
Customer Reviews
0%
Certifications
90%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
25%

About Prime Time Solar

Prime Time Solar has been installing solar panels since 2010 and serves Northamptonshire as part of its coverage across the South East and East Midlands of England. The company operates from its base at Choles Yard, 284 High Road, North Weald, CM16 6EG in Essex, with installation teams travelling across Northamptonshire including Northampton, Wellingborough, Corby, Kettering, and Daventry. Phone: 01992 238756.

Prime Time Solar holds a strong set of accreditations: MCS (Microgeneration Certification Scheme), HIES (Home Insulation and Energy Systems Quality Assured Contractors Scheme), EPVS (Energy Performance Validation Scheme), and Checkatrade membership. The company is also Gas Safe registered. This combination of accreditations covers quality standards for installation, consumer code compliance, deposit protection, and energy performance validation.

With over 15 years of trading experience, Prime Time Solar focuses on residential and commercial solar PV installation alongside battery storage and EV charger installation. The team brings experience across a wide range of property types, from suburban homes to rural agricultural buildings.

The HIES accreditation means customers benefit from deposit protection through an approved insurance scheme, as well as redress options if disputes arise. The Checkatrade membership provides an additional layer of vetting through background-checked tradespeople and customer review verification.

All installations are MCS registered, qualifying homeowners for the Smart Export Guarantee. Prime Time Solar provides competitive quotes and has built a track record of installations across Northamptonshire over more than a decade.

Service Area

Prime Time Solar serves the following areas within a 80 km radius:

NorthamptonWellingboroughCorbyKetteringDaventry

Are you Prime Time Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

MCS HIES EPVS

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Prime Time Solar

What services does Prime Time Solar offer?

Prime Time Solar offers Solar Installation, Battery Storage, EV Charging.

Is Prime Time Solar MCS certified?

Yes, Prime Time Solar is MCS certified and also holds HIES, EPVS certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Prime Time Solar serve?

Prime Time Solar serves Northampton, Wellingborough, Corby, Kettering, Daventry. They are based in Northampton with a service radius of 80 km.

What warranty does Prime Time Solar offer?

Prime Time Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Prime Time Solar's customer reviews?

Prime Time Solar does not have any reviews yet. Be the first to leave a review after using their services.

How long has Prime Time Solar been in business?

Prime Time Solar was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Prime Time Solar

Fill in your details and we'll connect you with Prime Time Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote