Progressive Power Solutions
NABCEP certified Utah solar installer since 2006 with A+ BBB rating and zero unhappy customers
20+
Years in Business
300+
Projects Completed
43
Customer Reviews
50 mi
Service Area
1-10
Employees
SurgePV Score
About Progressive Power Solutions
Progressive Power Solutions (PPS) is a solar installation company located at 350 S 900 E Street, Orem, UT 84097, serving Provo and the greater Utah County area. Founded in 2006, PPS is Utah’s most experienced provider of solar PV energy systems for homes and commercial properties.
The company holds NABCEP certification and a BBB A+ rating since 2008. NABCEP certified design engineers review every project to match a system to the customer’s specific energy needs. PPS has installed over 300 solar systems with zero unhappy customers, with most new business coming via referrals from satisfied clients.
PPS offers comprehensive services including system engineering, installation by licensed electricians, battery backup solutions for grid independence and emergency preparedness, and ongoing system maintenance. The company serves residential and commercial customers throughout Utah County and the greater Salt Lake area.
Service Area
Progressive Power Solutions serves the following areas within a 50-mile radius:
Contact Information
Are you Progressive Power Solutions?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
43 reviews
Verified Customer
PPS has been in business for nearly 20 years and their experience shows. The NABCEP certified engineers designed a system perfectly sized for our home. Most of their business comes from referrals, which says everything.
Verified Customer
Outstanding work by licensed electricians who handled the entire installation. The battery backup system gives us peace of mind during outages. Highly recommend PPS.
Verified Customer
Good company with fair pricing. They took the time to explain every aspect of the system and helped us understand the long-term savings. Our utility bills have dropped substantially.
Frequently Asked Questions About Progressive Power Solutions
What services does Progressive Power Solutions offer?
Progressive Power Solutions offers Solar Installation, Battery Storage, Maintenance.
Is Progressive Power Solutions NABCEP certified?
Progressive Power Solutions holds the following certifications: NABCEP Certified, BBB A+. Contact them directly for the latest accreditation details.
What areas does Progressive Power Solutions serve?
Progressive Power Solutions serves Orem, Provo, Lehi, American Fork, Pleasant Grove, Salt Lake City. They are based in Provo with a service radius of 80 km.
What warranty does Progressive Power Solutions offer?
Progressive Power Solutions offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Progressive Power Solutions's customer reviews?
Progressive Power Solutions has a 4.7/5 rating based on 43 customer reviews. Customers consistently rate them highly.
How long has Progressive Power Solutions been in business?
Progressive Power Solutions was founded in 2006 and has been in business for 20 years. They are one of the more experienced solar installers in their area.
Similar Installers in Provo
Get a Free Solar Quote from Progressive Power Solutions
Fill in your details and we'll connect you with Progressive Power Solutions.
Quote request sent!
Progressive Power Solutions will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile