Quixotic Systems
Pioneer of solar energy installations in New York City since 1999, NABCEP and NYSERDA certified
27+
Years in Business
10
Customer Reviews
25 mi
Service Area
1-10
Employees
SurgePV Score
About Quixotic Systems
Quixotic Systems is one of the longest-operating solar installation companies in New York City, founded in 1999 with offices at 90 Bedford St, Suite 1D in Manhattan’s West Village. The company helped pioneer solar energy installations in NYC and is certified by both NYSERDA and NABCEP for solar electric (PV) and solar thermal installations. Quixotic Systems is also a licensed New York City general contractor.
The company specializes in creative solar solutions for NYC’s challenging built environment, including a notable vertical “solar wall” installation in the Bronx that demonstrated the company’s engineering capabilities. Quixotic Systems designs and installs both residential and commercial solar systems across all five boroughs.
Quixotic Systems handles system design, NYC Department of Buildings permitting, installation, utility interconnection, and ongoing maintenance. The company provides free consultations and assists customers with New York solar incentive programs including the NY-Sun program and local property tax abatements.
Service Area
Quixotic Systems serves the following areas within a 25-mile radius:
Contact Information
Are you Quixotic Systems?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
10 reviews
Thomas H.
Quixotic Systems has been doing solar in NYC longer than almost anyone. Their expertise with NYC building codes and roof configurations is unmatched.
Margaret W.
Professional installation on our Manhattan building. Quixotic handled all permits and the Con Edison interconnection process smoothly.
Steven B.
Quixotic Systems designed a creative vertical solar wall solution for our building. Their NABCEP certification gave us confidence in their technical abilities.
Frequently Asked Questions About Quixotic Systems
What services does Quixotic Systems offer?
Quixotic Systems offers Solar Installation, Solar Design, Maintenance, Grid Connection.
Is Quixotic Systems NABCEP certified?
Yes, Quixotic Systems is NABCEP certified and also holds NYSERDA Certified, NYC Licensed General Contractor certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Quixotic Systems serve?
Quixotic Systems serves Manhattan, Brooklyn, Queens, Bronx, Staten Island. They are based in New York with a service radius of 40 km.
What warranty does Quixotic Systems offer?
Quixotic Systems offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Quixotic Systems's customer reviews?
Quixotic Systems has a 4.5/5 rating based on 10 customer reviews. Customers consistently rate them highly.
How long has Quixotic Systems been in business?
Quixotic Systems was founded in 1999 and has been in business for 27 years. They are one of the more experienced solar installers in their area.
Similar Installers in New York
Get a Free Solar Quote from Quixotic Systems
Fill in your details and we'll connect you with Quixotic Systems.
Quote request sent!
Quixotic Systems will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile