RS

Rectify Solar

Family-owned NanoGrid smart home integrators with 1,000+ solar installations and 10+ years of experience in Indianapolis

Indianapolis, Indiana
4.3 (85 reviews)
Verified
Residential Commercial

13+

Years in Business

85

Customer Reviews

75 mi

Service Area

11-50

Employees

SurgePV Score

9.2 / 10
Customer Reviews
86%
Certifications
100%
Experience
85%
Services Range
100%
Warranty Coverage
80%
Online Presence
100%

About Rectify Solar

Rectify Solar is a family-owned solar installation company founded in 2013, headquartered at 3911 N College Ave in Indianapolis. The company has completed over 1,000 residential and commercial solar installations across central Indiana, earning a reputation for high-quality workmanship and transparent customer service. Rectify also maintains an office in Campbell, California.

The company holds NABCEP certification and is one of only a small number of Indiana solar contractors qualified for Pearl Certification, placing it in the top 5% of solar contractors nationwide. Rectify offers solar panel installations, battery storage systems, EV charging stations, insulation, and roofing services. The team handles all electrical and construction permits and assists homeowners with Indianapolis Power and Light grid connection and net metering applications.

Rectify Solar carries a 4.3-star overall rating across multiple review platforms, with customers consistently praising the company’s communication, installation quality, and adherence to industry standards. The company offers a 25-year product warranty on solar panels and a 10-year workmanship warranty, along with zero-down financing options for energy efficiency upgrades when paired with solar.

Service Area

Rectify Solar serves the following areas within a 75-mile radius:

IndianapolisCarmelFishersNoblesvilleGreenwoodLawrenceZionsvilleBrownsburg

Are you Rectify Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Energy Audit
Monitoring
Roof Assessment

Certifications & Accreditations

NABCEP Pearl Certification EPA Lead Safety Certified OSHA Safety Certified

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.3

85 reviews

Mark T.

15 July 2025
Verified Customer

Rectify handled our entire solar project from start to finish. The crew was professional, answered every question we had, and the system has been performing above estimates since day one. Very happy with the quality of work.

Sarah L.

20 March 2025
Verified Customer

Good experience overall. The installation team was courteous and cleaned up well after themselves. Permitting took a bit longer than expected but Rectify kept us informed throughout the process.

James W.

8 November 2024
Verified Customer

We went with Rectify because they are local and family-owned. They helped us navigate the net metering application with IPL and the system was up and running within six weeks of signing the contract.

Frequently Asked Questions About Rectify Solar

What services does Rectify Solar offer?

Rectify Solar offers Solar Installation, Battery Storage, EV Charging, Energy Audit, Monitoring, Roof Assessment.

Is Rectify Solar NABCEP certified?

Yes, Rectify Solar is NABCEP certified and also holds Pearl Certification, EPA Lead Safety Certified, OSHA Safety Certified certifications. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Rectify Solar serve?

Rectify Solar serves Indianapolis, Carmel, Fishers, Noblesville, Greenwood, Lawrence, Zionsville, Brownsburg. They are based in Indianapolis with a service radius of 120 km.

What warranty does Rectify Solar offer?

Rectify Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Rectify Solar's customer reviews?

Rectify Solar has a 4.3/5 rating based on 85 customer reviews. They are well-regarded by their customers.

How long has Rectify Solar been in business?

Rectify Solar was founded in 2013 and has been in business for 13 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Rectify Solar

Fill in your details and we'll connect you with Rectify Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote