RR

Redwood Renewables (Peterborough)

MCS and Tesla Authorised solar panel, battery storage, and EV charger installer serving Peterborough

Peterborough, UK
3.5 (6 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

6

Customer Reviews

60 km

Service Area

11-50

Employees

SurgePV Score

7.3 / 10
Customer Reviews
70%
Certifications
75%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
25%

About Redwood Renewables (Peterborough)

Redwood Renewables is a renewable energy company serving Peterborough and the surrounding area, with its head office at Criterion House, 40 Parkway, Chelmsford CM2 7PN. The company provides solar panel installation, battery storage, EV charging, and grid connection services across the Peterborough, Huntingdon, Ely, St Ives, and March areas. Phone: 01245 823255.

Redwood Renewables holds MCS (Microgeneration Certification Scheme) and HIES (Home Insulation and Energy Systems) certifications, and is a Tesla Authorised Installer for Powerwall battery storage and the Tesla Wall Connector EV charger. The Tesla authorised status reflects product-specific training requirements and means customers benefit from official manufacturer warranties on Powerwall units installed by the company.

Services offered in the Peterborough area include solar panel consultation and design, solar PV installation, battery storage (including Tesla Powerwall), EV charging point installation, grid connection services, and solar panel removal and reinstallation — useful for homeowners who need to have panels temporarily removed for roof work.

Redwood Renewables is also registered with the Installation Assurance Authority (IAA), which provides independent oversight of renewable energy installations, and is part of a government-endorsed quality scheme for home improvement trades.

On Trustpilot, the company holds a 3.5-star rating across 6 reviews, with customers noting smooth processes and professional service. All MCS-registered installations qualify Peterborough customers for the Smart Export Guarantee.

Service Area

Redwood Renewables (Peterborough) serves the following areas within a 60 km radius:

PeterboroughHuntingdonElySt IvesMarch

Are you Redwood Renewables (Peterborough)?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

MCS HIES

Partner Manufacturers

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Redwood Renewables (Peterborough)

What services does Redwood Renewables (Peterborough) offer?

Redwood Renewables (Peterborough) offers Solar Installation, Battery Storage, EV Charging.

Is Redwood Renewables (Peterborough) MCS certified?

Yes, Redwood Renewables (Peterborough) is MCS certified and also holds HIES certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Redwood Renewables (Peterborough) serve?

Redwood Renewables (Peterborough) serves Peterborough, Huntingdon, Ely, St Ives, March. They are based in Peterborough with a service radius of 60 km.

What warranty does Redwood Renewables (Peterborough) offer?

Redwood Renewables (Peterborough) offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Redwood Renewables (Peterborough)'s customer reviews?

Redwood Renewables (Peterborough) has a 3.5/5 rating based on 6 customer reviews. See individual reviews on this page for more detail.

How long has Redwood Renewables (Peterborough) been in business?

Redwood Renewables (Peterborough) was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Redwood Renewables (Peterborough)

Fill in your details and we'll connect you with Redwood Renewables (Peterborough).

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote