RS

Region Solar + Electric

Family-run solar and electrical contractor serving Sarasota and Southwest Florida since 2007

Sarasota, Florida
4.8 (20 reviews)
Verified
Residential Commercial Industrial

19+

Years in Business

0

20

Customer Reviews

75 mi

Service Area

2-10

Employees

SurgePV Score

8.9 / 10
Customer Reviews
96%
Certifications
90%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About Region Solar + Electric

Region Solar + Electric is a family-run solar and electrical contractor headquartered at 4366 Independence Ct, Unit F, Sarasota, FL 34234. Founded in 2007, the company has over 18 years of experience designing, installing, and maintaining solar energy systems for residential, commercial, and industrial customers across six Florida counties including Sarasota, Manatee, Lee, Charlotte, Pinellas, and Hillsborough.

The company holds Florida State Certified Solar Contractor (CVC56744) and Electrical Contractor (EC13012770) licenses issued by the Florida Department of Business and Professional Regulation. Region Solar provides fully customized solutions for lowering energy costs, adding battery storage, charging electric vehicles, and upgrading electrical infrastructure. The company was selected as the solar provider for the Sarasota Solar Co-op and won the silver Best of SRQ award in 2022.

Region Solar has a 4.8-star Google rating and earned BBB accreditation in October 2023. Leadership includes owners Lydia Patton and Steven Forrester, with Ben O’Reilly serving as Director of Operations. The company operates Monday through Friday from 9:00 AM to 5:00 PM.

Service Area

Region Solar + Electric serves the following areas within a 75-mile radius:

SarasotaBradentonVeniceTampaSt. PetersburgFort MyersNaples

Are you Region Solar + Electric?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance

Certifications & Accreditations

State Certified Solar Contractor State Certified Electrical Contractor BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

20 reviews

Verified Customer

20 August 2025
Verified Customer

A top notch solar installer. Region Solar was vetted and chosen by Solar United Neighbors. Excellent communication, professional installation and an investment in your greener days.

Verified Customer

15 June 2025
Verified Customer

The team at Region Solar handled everything from design to permitting to installation. Quality workmanship and they stood behind their work. Very pleased with the results.

Verified Customer

10 March 2025
Verified Customer

Region Solar made the entire process straightforward. The system is performing exactly as they projected. Professional team from start to finish.

Frequently Asked Questions About Region Solar + Electric

What services does Region Solar + Electric offer?

Region Solar + Electric offers Solar Installation, Battery Storage, EV Charging, Maintenance.

Is Region Solar + Electric NABCEP certified?

Region Solar + Electric holds the following certifications: State Certified Solar Contractor, State Certified Electrical Contractor, BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Region Solar + Electric serve?

Region Solar + Electric serves Sarasota, Bradenton, Venice, Tampa, St. Petersburg, Fort Myers, Naples. They are based in Sarasota with a service radius of 120 km.

What warranty does Region Solar + Electric offer?

Region Solar + Electric offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Region Solar + Electric's customer reviews?

Region Solar + Electric has a 4.8/5 rating based on 20 customer reviews. Customers consistently rate them highly.

How long has Region Solar + Electric been in business?

Region Solar + Electric was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Region Solar + Electric

Fill in your details and we'll connect you with Region Solar + Electric.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote