Renu Energy Solutions
The Carolinas' top solar and battery installer with 6,000+ residential and 85+ commercial projects since 2010
16+
Years in Business
6,000+
Projects Completed
290
Customer Reviews
99 mi
Service Area
11-50
Employees
SurgePV Score
About Renu Energy Solutions
Renu Energy Solutions is a locally owned solar installer headquartered at 801 Pressley Rd, Suite 100, Charlotte, NC 28217. Founded in 2010 by Jay Radcliffe, Renu has grown into one of the largest residential and commercial solar providers in the Carolinas, completing more than 6,000 residential installations and 85 commercial projects across North and South Carolina. The company holds a NC General Contractor license, NC Electrician license, and SC General Contractor and Electrical licenses.
Renu employs nine full-time NABCEP-certified professionals and is a Tesla Powerwall and Solar Roof Premier Certified Installer, Enphase Certified Installer, and REC ProTrust Certified Installer. The company primarily installs SunPower panels alongside Tesla Powerwall, Enphase, and FranklinWH battery storage systems. Renu handles every stage of a solar project in-house, from initial site assessment and system design through permitting, installation, and ongoing monitoring.
With a 4.7-star average across 290 reviews on EnergySage and an A+ BBB rating, Renu is consistently ranked among the top solar installers in North Carolina. The company backs all installations with a 25-year product, performance, and labor warranty. Renu also operates a dedicated solar service and maintenance division for ongoing system support, and maintains regional offices in Durham, Greenville SC, Arden, and Columbia SC.
Service Area
Renu Energy Solutions serves the following areas within a 99-mile radius:
Contact Information
Are you Renu Energy Solutions?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
25 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
290 reviews
Michael T.
Renu walked us through every step of the process from initial consultation to final inspection. The crew was professional and completed the installation in a single day. Our system has been producing above estimates for six months.
Sarah L.
Chose Renu after getting multiple quotes across Charlotte. Their NABCEP-certified team designed a system that maximized our south-facing roof. The Tesla Powerwall keeps our house running through summer storms.
David K.
Solid installation and great equipment choices. The permitting timeline took longer than originally quoted but that was a city issue, not Renu's fault. System performance has been exactly as projected.
Frequently Asked Questions About Renu Energy Solutions
What services does Renu Energy Solutions offer?
Renu Energy Solutions offers Solar Installation, Battery Storage, EV Charging, Maintenance, Monitoring, Solar Design, Commercial Solar.
Is Renu Energy Solutions NABCEP certified?
Yes, Renu Energy Solutions is NABCEP certified and also holds Tesla Powerwall Premier Certified, Tesla Solar Roof Premier Certified, Enphase Certified, REC ProTrust Certified, BBB A+ Rating certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Renu Energy Solutions serve?
Renu Energy Solutions serves Charlotte, Concord, Gastonia, Rock Hill, Huntersville, Matthews, Mooresville, Indian Trail and 2 other areas. They are based in Charlotte with a service radius of 160 km.
What warranty does Renu Energy Solutions offer?
Renu Energy Solutions offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.
How are Renu Energy Solutions's customer reviews?
Renu Energy Solutions has a 4.7/5 rating based on 290 customer reviews. Customers consistently rate them highly.
How long has Renu Energy Solutions been in business?
Renu Energy Solutions was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.
Similar Installers in Charlotte
Get a Free Solar Quote from Renu Energy Solutions
Fill in your details and we'll connect you with Renu Energy Solutions.
Quote request sent!
Renu Energy Solutions will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile