RM Green Energy
Family-run solar panel and battery storage specialists serving Plymouth, Devon and Cornwall
2026+
Years in Business
35
Customer Reviews
80 km
Service Area
1-10
Employees
SurgePV Score
About RM Green Energy
RM Green Energy is a family-run solar energy company based in Plympton, Plymouth, serving residential and commercial customers across Devon, Cornwall, and Somerset. The company is a RECC (Renewable Energy Consumer Code) approved installer, giving customers the protections of the industry consumer code and a dispute resolution route if required.
RM Green Energy grew out of a parent home improvements company with a background in doors and windows, bringing an existing base of trusted customer relationships and property expertise to the renewable energy sector. The business focuses on customised solar PV and battery storage solutions designed to meet the specific energy requirements of each property, whether a standard domestic rooftop installation or a larger commercial system.
The company’s team of qualified engineers manages the full installation process from initial assessment and system design through to installation, commissioning, and handover. RM Green Energy serves the whole of Devon and Cornwall from its Plymouth base, with additional coverage into Somerset.
Customer feedback highlights the company’s professionalism and the seamless experience they deliver from initial enquiry to completed installation. As a family business, RM Green Energy emphasises building lasting relationships with customers and providing honest, straightforward advice about which solar solution will deliver the best return for each property.
Service Area
RM Green Energy serves the following areas within a 80 km radius:
Contact Information
Are you RM Green Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.9
35 reviews
Verified Customer
RM Green Energy provided exceptional service and made the solar panel installation process effortless. Their team of expert installers is professional and focused on customer satisfaction.
Frequently Asked Questions About RM Green Energy
What services does RM Green Energy offer?
RM Green Energy offers Solar Installation, Battery Storage.
Is RM Green Energy MCS certified?
RM Green Energy holds the following certifications: RECC. Contact them directly for the latest accreditation details.
What areas does RM Green Energy serve?
RM Green Energy serves Plymouth, Devon, Cornwall, Somerset. They are based in Plymouth with a service radius of 80 km.
What warranty does RM Green Energy offer?
RM Green Energy offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are RM Green Energy's customer reviews?
RM Green Energy has a 4.9/5 rating based on 35 customer reviews. Customers consistently rate them highly.
How long has RM Green Energy been in business?
RM Green Energy was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Plymouth
Get a Free Solar Quote from RM Green Energy
Fill in your details and we'll connect you with RM Green Energy.
Quote request sent!
RM Green Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile