Robco Electric
Locally owned Las Vegas solar and electrical contractor since 1997 with over 3,000 satisfied solar customers
29+
Years in Business
3,000+
Projects Completed
279
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Robco Electric
Robco Electric is a locally owned and operated Las Vegas solar and electrical contracting company founded in 1997 by master electrician Rob Kowalczik. Headquartered at 5692 La Costa Canyon Ct, Suite 105 in Las Vegas, Robco started as a C-2 electrical contractor and expanded into solar installation, becoming one of the highest-rated solar companies in the Las Vegas Valley.
The company has completed over 3,000 solar installations for residential and commercial customers with zero complaints filed with the Nevada State Contractor Board. Robco Electric is BBB accredited with an A+ rating since 2020 and maintains top ratings across Google, Yelp, Nextdoor, and HomeAdvisor. The company handles both solar panel installation and general electrical services.
Robco Electric provides free solar consultations, custom system design, permitting, installation, and ongoing maintenance. The company’s in-house team of licensed electricians handles every aspect of the installation process, from initial assessment to final connection with NV Energy.
Service Area
Robco Electric serves the following areas within a 50-mile radius:
Contact Information
Are you Robco Electric?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
279 reviews
Karen M.
Robco was professional from start to finish. Rob and his team designed a system that perfectly fits our home. No complaints filed with the Nevada State Contractor Board speaks volumes.
Steven P.
As a locally owned company, Robco treated us like family. The installation was clean, efficient, and our electric bill has dropped significantly. Highly recommend.
Lisa W.
We compared several solar companies and Robco stood out for their honesty and expertise. Being a master electrician, Rob knows his stuff. Great experience overall.
Frequently Asked Questions About Robco Electric
What services does Robco Electric offer?
Robco Electric offers Solar Installation, Battery Storage, Maintenance, Solar Design, electrical_services.
Is Robco Electric NABCEP certified?
Robco Electric holds the following certifications: BBB Accredited, NV Master Electrician. Contact them directly for the latest accreditation details.
What areas does Robco Electric serve?
Robco Electric serves Las Vegas, Henderson, North Las Vegas, Summerlin, Boulder City. They are based in Las Vegas with a service radius of 80 km.
What warranty does Robco Electric offer?
Robco Electric offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Robco Electric's customer reviews?
Robco Electric has a 4.9/5 rating based on 279 customer reviews. Customers consistently rate them highly.
How long has Robco Electric been in business?
Robco Electric was founded in 1997 and has been in business for 29 years. They are one of the more experienced solar installers in their area.
Similar Installers in Las Vegas
Get a Free Solar Quote from Robco Electric
Fill in your details and we'll connect you with Robco Electric.
Quote request sent!
Robco Electric will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile