Sol-Up
Nevada's premier solar installer since 2009 with over 2,000 five-star reviews across platforms
17+
Years in Business
2,147
Customer Reviews
50 mi
Service Area
51-200
Employees
SurgePV Score
About Sol-Up
Sol-Up is one of Nevada’s largest and most established solar installation companies. Founded in 2009, the company is headquartered at 4305 Dean Martin Dr, Suite 150 in Las Vegas. Sol-Up provides residential and commercial solar panel installation, battery storage, and ongoing maintenance services across the Las Vegas Valley and surrounding communities.
The company holds Nevada Business License NV20091200594 and Nevada Contractor’s License #0075025. Sol-Up uses an in-house installation team rather than subcontractors, which the company credits for its high customer satisfaction rates. The company is BBB accredited and has accumulated over 2,000 five-star reviews across platforms including Google, Yelp, and SolarReviews.
Sol-Up offers free solar consultations, custom system design, permitting assistance, and post-installation monitoring. The company installs Tesla Powerwall battery storage systems alongside its solar panel installations. Sol-Up serves residential and commercial customers throughout Las Vegas, Henderson, North Las Vegas, Summerlin, Boulder City, and Spring Valley.
Service Area
Sol-Up serves the following areas within a 50-mile radius:
Contact Information
Are you Sol-Up?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
2147 reviews
Mark T.
Sol-Up handled everything from design to permitting. Lightning fast responsiveness on every aspect from issues, questions, to follow-ups. Highly recommend.
Jennifer L.
Professional service and knowledge about all aspects of solar equipment. In-house installation team means better follow up and higher quality installation.
David R.
Zero sales pressure. They took the time to explain everything about how solar works with NV Energy. Standard 25-year manufacturer warranty gave us peace of mind.
Frequently Asked Questions About Sol-Up
What services does Sol-Up offer?
Sol-Up offers Solar Installation, Battery Storage, Maintenance, Monitoring, Solar Design, Energy Audit.
Is Sol-Up NABCEP certified?
Sol-Up holds the following certifications: BBB Accredited, NV Contractor License #0075025. Contact them directly for the latest accreditation details.
What areas does Sol-Up serve?
Sol-Up serves Las Vegas, Henderson, North Las Vegas, Summerlin, Boulder City, Spring Valley. They are based in Las Vegas with a service radius of 80 km.
What warranty does Sol-Up offer?
Sol-Up offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Sol-Up's customer reviews?
Sol-Up has a 4.9/5 rating based on 2147 customer reviews. Customers consistently rate them highly.
How long has Sol-Up been in business?
Sol-Up was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Las Vegas
Get a Free Solar Quote from Sol-Up
Fill in your details and we'll connect you with Sol-Up.
Quote request sent!
Sol-Up will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile