RP

RSRV Power

Carolina-based vertically integrated solar installer delivering residential solar from sales through post-installation support

Charlotte, North Carolina
4.5 (45 reviews)
Verified
Residential

9+

Years in Business

45

Customer Reviews

62 mi

Service Area

11-50

Employees

SurgePV Score

8.6 / 10
Customer Reviews
90%
Certifications
75%
Experience
85%
Services Range
90%
Warranty Coverage
80%
Online Presence
100%

About RSRV Power

RSRV Power is a Carolina-based residential solar sales and installation company located at 4123-A Rose Lake Dr, Charlotte, NC 28217. Founded in 2017, RSRV Power operates a vertically integrated model where their in-house team handles every step from initial sales consultation through system design, permitting, installation, and post-installation support. The company is NABCEP certified and holds a BBB A+ rating.

The company focuses on homeowners in the Charlotte metropolitan area and surrounding communities. RSRV Power installs panels from leading manufacturers including Q Cells and Silfab, paired with Enphase and SolarEdge inverters and battery storage from Enphase and Tesla. The team works with each homeowner to design a system sized for their specific energy usage and roof configuration.

RSRV Power maintains positive ratings across multiple review platforms, with a 5.0-star rating on HomeAdvisor and strong marks on Google. The company offers 25-year warranties on panels and inverters alongside a 10-year workmanship warranty. Customers frequently highlight the straightforward sales process and professional installation crews in their reviews.

Service Area

RSRV Power serves the following areas within a 62-mile radius:

CharlotteConcordHuntersvilleMatthewsIndian TrailGastoniaRock HillMooresville

Are you RSRV Power?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Monitoring

Certifications & Accreditations

NABCEP BBB A+ Rating

Partner Manufacturers

Panels

Q CellsSilfab

Inverters

EnphaseSolarEdge

Batteries

EnphaseTesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

45 reviews

Tom W.

15 August 2025
Verified Customer

RSRV Power made going solar straightforward. They handled the design, permitting, and installation without any hiccups. Our 10 kW system is producing more than projected every month.

Karen B.

22 April 2025
Verified Customer

From the first consultation to turning on the system, RSRV was responsive and professional. The crew finished in one day and cleaned up everything. Our electric bill basically disappeared.

Daniel S.

8 December 2024
Verified Customer

Good quality installation and fair pricing. The sales process was no-pressure which I appreciated. Took a bit longer than expected to get the city inspection scheduled but the system works great.

Frequently Asked Questions About RSRV Power

What services does RSRV Power offer?

RSRV Power offers Solar Installation, Battery Storage, Solar Design, Monitoring.

Is RSRV Power NABCEP certified?

Yes, RSRV Power is NABCEP certified and also holds BBB A+ Rating certification. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does RSRV Power serve?

RSRV Power serves Charlotte, Concord, Huntersville, Matthews, Indian Trail, Gastonia, Rock Hill, Mooresville. They are based in Charlotte with a service radius of 100 km.

What warranty does RSRV Power offer?

RSRV Power offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are RSRV Power's customer reviews?

RSRV Power has a 4.5/5 rating based on 45 customer reviews. Customers consistently rate them highly.

How long has RSRV Power been in business?

RSRV Power was founded in 2017 and has been in business for 9 years. They have solid experience in the solar industry.

Get a Free Solar Quote from RSRV Power

Fill in your details and we'll connect you with RSRV Power.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote