Sarasota SRQ Solar
Local Sarasota solar energy expert providing residential and commercial solar installations and battery storage
2026+
Years in Business
5
Customer Reviews
50 mi
Service Area
2-10
Employees
SurgePV Score
About Sarasota SRQ Solar
Sarasota SRQ Solar is a local solar energy company headquartered at 2383 Industrial Blvd, Sarasota, FL 34234. The company provides solar panel installations and battery storage solutions for residential and commercial customers throughout the Sarasota area.
Sarasota SRQ Solar is fully licensed, bonded, and insured, with contractors who have decades of combined experience including certifications and on-the-job training. The company offers customized solar panel designs for both on-grid and off-grid systems, including battery storage to keep homes and businesses powered during outages. All work is performed by licensed and insured contractors.
The company serves the Sarasota, Bradenton, Venice, Lakewood Ranch, and North Port areas. Customers praise the team’s local knowledge of Sarasota’s building codes and utility interconnection requirements.
Service Area
Sarasota SRQ Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Sarasota SRQ Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
5 reviews
Verified Customer
SRQ Solar made the process easy and answered all my questions along the way. The installation was clean and the system has been producing consistently since it was turned on.
Verified Customer
Great local company that knows the Sarasota market. Handled everything from permits to final inspection. Highly recommend for anyone looking to go solar.
Verified Customer
Solid solar installation at a fair price. The team was professional and the battery storage integration gives us peace of mind during storm season.
Frequently Asked Questions About Sarasota SRQ Solar
What services does Sarasota SRQ Solar offer?
Sarasota SRQ Solar offers Solar Installation, Battery Storage.
Is Sarasota SRQ Solar NABCEP certified?
Sarasota SRQ Solar holds the following certifications: Licensed and Insured. Contact them directly for the latest accreditation details.
What areas does Sarasota SRQ Solar serve?
Sarasota SRQ Solar serves Sarasota, Bradenton, Venice, Lakewood Ranch, North Port. They are based in Sarasota with a service radius of 80 km.
What warranty does Sarasota SRQ Solar offer?
Sarasota SRQ Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Sarasota SRQ Solar's customer reviews?
Sarasota SRQ Solar has a 4.5/5 rating based on 5 customer reviews. Customers consistently rate them highly.
How long has Sarasota SRQ Solar been in business?
Sarasota SRQ Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Sarasota
Get a Free Solar Quote from Sarasota SRQ Solar
Fill in your details and we'll connect you with Sarasota SRQ Solar.
Quote request sent!
Sarasota SRQ Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile