SC Solar Energy
North Charleston solar company with over 14 years of experience serving residential and commercial clients
16+
Years in Business
20
Customer Reviews
50 mi
Service Area
2-10
Employees
SurgePV Score
About SC Solar Energy
SC Solar Energy is a solar installation company based at 4000 Faber Place Drive in North Charleston. With over 14 years of experience in the industry, the company provides residential and commercial solar energy solutions throughout the greater Charleston area. SC Solar Energy focuses on designing systems that are right-sized for each customer’s energy needs and budget, avoiding the oversizing that sometimes occurs with commission-driven sales teams.
The company installs panels from Hanwha Q Cells and REC, paired with Enphase and SolarEdge inverters. Battery storage options include the Tesla Powerwall. SC Solar Energy handles every phase of the project from initial energy audit and system design through permitting, installation, and utility interconnection. The company serves customers in the Dominion Energy, Berkeley Electric, and other local utility service territories.
SC Solar Energy holds a 4.5-star rating across review platforms. The company operates Monday through Friday, 8:00 am to 5:00 pm. Customers praise the straightforward pricing, professional installations, and local knowledge that comes from over a decade of working specifically in the South Carolina solar market.
Service Area
SC Solar Energy serves the following areas within a 50-mile radius:
Contact Information
Are you SC Solar Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
20 reviews
Robert J.
SC Solar Energy was straightforward from the start. No gimmicks, just honest pricing and quality work. The system is producing exactly what they estimated.
Lisa M.
Good local company with fair prices. The installation went smoothly and they handled all the permitting. Took about six weeks from signing to having the system turned on.
Greg T.
Chose SC Solar Energy because they're truly local with years of experience. The team was professional and the system quality is excellent. Already seeing savings on our Dominion Energy bill.
Frequently Asked Questions About SC Solar Energy
What services does SC Solar Energy offer?
SC Solar Energy offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection.
Is SC Solar Energy NABCEP certified?
SC Solar Energy holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does SC Solar Energy serve?
SC Solar Energy serves Charleston, North Charleston, Mount Pleasant, Summerville, Goose Creek, James Island. They are based in Charleston with a service radius of 80 km.
What warranty does SC Solar Energy offer?
SC Solar Energy offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are SC Solar Energy's customer reviews?
SC Solar Energy has a 4.5/5 rating based on 20 customer reviews. Customers consistently rate them highly.
How long has SC Solar Energy been in business?
SC Solar Energy was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.
Similar Installers in Charleston
Get a Free Solar Quote from SC Solar Energy
Fill in your details and we'll connect you with SC Solar Energy.
Quote request sent!
SC Solar Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile