Schoenherr Solar
Roofing and solar specialists serving the Greater Detroit Metro from Romeo, Michigan
6+
Years in Business
200+
Projects Completed
35
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Schoenherr Solar
Schoenherr Solar is the solar division of Schoenherr Homes, a well-established roofing and home improvement company based in Romeo, Michigan. The company leverages over 30 years of roofing experience to provide integrated roof and solar installation services throughout the Greater Detroit Metropolitan area. Their combined expertise in roofing and solar means they can assess roof condition, perform any necessary repairs or replacements, and install solar panels as a coordinated project.
The company offers residential and commercial solar panel installations, home battery storage systems, and customized energy solutions. Schoenherr Solar handles the complete project from initial roof and site assessment through system design, permitting, installation, and utility interconnection. Their roofing background gives them a strong understanding of structural requirements, waterproofing, and panel mounting that pure solar companies may lack.
Operating from their office at 102 W Saint Clair Street in Romeo, Schoenherr Solar serves communities across Macomb, Oakland, and Wayne counties. The parent company’s BBB-accredited roofing division and decades of local presence provide homeowners with confidence in the company’s reliability and workmanship. Schoenherr Solar helps customers maximize savings through available Michigan solar incentives and utility programs.
Service Area
Schoenherr Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Schoenherr Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
35 reviews
Brian K.
We needed both a new roof and solar panels, so Schoenherr was the perfect choice. They coordinated both projects seamlessly, and the final result looks fantastic. The panels are integrated well with the new roof and our energy bills have dropped significantly.
Amy L.
Good experience with Schoenherr Solar. The team was knowledgeable and the installation was done professionally. Having the roofing expertise in-house is a real advantage because they understand roof structure and load requirements.
Greg M.
Schoenherr installed our system in just two days. They handled all the permitting and utility paperwork, which saved us a lot of hassle. The system has been performing exactly as they projected.
Frequently Asked Questions About Schoenherr Solar
What services does Schoenherr Solar offer?
Schoenherr Solar offers Solar Installation, Battery Storage, Solar Design, Roof Assessment.
Is Schoenherr Solar NABCEP certified?
Schoenherr Solar holds the following certifications: BBB Accredited (Roofing Division). Contact them directly for the latest accreditation details.
What areas does Schoenherr Solar serve?
Schoenherr Solar serves Detroit, Romeo, Rochester Hills, Shelby Township, Sterling Heights, Troy, Warren, Macomb and 2 other areas. They are based in Detroit with a service radius of 80 km.
What warranty does Schoenherr Solar offer?
Schoenherr Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Schoenherr Solar's customer reviews?
Schoenherr Solar has a 4.5/5 rating based on 35 customer reviews. Customers consistently rate them highly.
How long has Schoenherr Solar been in business?
Schoenherr Solar was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.
Similar Installers in Detroit
Get a Free Solar Quote from Schoenherr Solar
Fill in your details and we'll connect you with Schoenherr Solar.
Quote request sent!
Schoenherr Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile