Smart Solar Energy
Oregon solar installer providing residential and commercial solar solutions across the Northwest since 2011
15+
Years in Business
36
Customer Reviews
124 mi
Service Area
51-200
Employees
SurgePV Score
About Smart Solar Energy
Smart Solar Energy is a solar installation company with a Eugene office at 2769 Chad Drive and headquarters in Portland, Oregon. Founded in 2011, the company provides residential and commercial solar solutions across the Pacific Northwest, serving communities throughout Oregon and Washington.
The company has served thousands of homeowners and business owners in the Eugene area and beyond, handling the full process from initial consultation and system design through permitting, installation, and ongoing monitoring. Smart Solar Energy operates from multiple locations across Oregon including Portland, Eugene, Salem, Bend, and Medford.
Smart Solar Energy maintains a 4.7-star average rating from 36 reviews, with customers praising the company’s professionalism, system performance, and responsive customer service. The company was recognized on the Inc. 5000 list and continues to expand its service footprint across the Northwest.
Service Area
Smart Solar Energy serves the following areas within a 124-mile radius:
Contact Information
Are you Smart Solar Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
36 reviews
Nathan B.
Smart Solar Energy made going solar easy for our Eugene home. The team handled everything from design through installation. Great communication throughout.
Donna F.
Thousands of installations across Oregon gives you confidence. Our system is performing above projections even during cloudy months.
Chris E.
Professional installation and good follow-up service. The online monitoring portal makes it easy to track production. Satisfied with the experience.
Frequently Asked Questions About Smart Solar Energy
What services does Smart Solar Energy offer?
Smart Solar Energy offers Solar Installation, Battery Storage, Solar Design, Grid Connection, Maintenance.
Is Smart Solar Energy NABCEP certified?
Smart Solar Energy holds the following certifications: Oregon Contractor License. Contact them directly for the latest accreditation details.
What areas does Smart Solar Energy serve?
Smart Solar Energy serves Eugene, Springfield, Portland, Salem, Bend, Medford. They are based in Eugene with a service radius of 200 km.
What warranty does Smart Solar Energy offer?
Smart Solar Energy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Smart Solar Energy's customer reviews?
Smart Solar Energy has a 4.7/5 rating based on 36 customer reviews. Customers consistently rate them highly.
How long has Smart Solar Energy been in business?
Smart Solar Energy was founded in 2011 and has been in business for 15 years. They are one of the more experienced solar installers in their area.
Similar Installers in Eugene
Get a Free Solar Quote from Smart Solar Energy
Fill in your details and we'll connect you with Smart Solar Energy.
Quote request sent!
Smart Solar Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile