SW

Smart Wave Solar

Utah solar and battery installer serving the Wasatch Front with residential and commercial solutions

Provo, Utah
4.7 (46 reviews)
Verified
Residential Commercial

7+

Years in Business

0

46

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

7.4 / 10
Customer Reviews
94%
Certifications
60%
Experience
70%
Services Range
60%
Warranty Coverage
80%
Online Presence
75%

About Smart Wave Solar

Smart Wave Solar is a solar and battery installation company located at 14553 S 790 W, Suite C, Bluffdale, UT 84065, serving Provo and the greater Wasatch Front. Founded in 2019, the company provides residential and commercial solar panel installation and battery storage solutions.

Smart Wave Solar is BBB accredited and serves customers across Utah County, Salt Lake County, and surrounding areas. The company offers system design, installation, and battery backup solutions for homeowners and businesses looking to reduce energy costs and increase energy independence.

The company serves Provo, Orem, Salt Lake City, and communities along the Wasatch Front, providing solar installations optimized for Utah’s climate conditions and local utility requirements.

Service Area

Smart Wave Solar serves the following areas within a 50-mile radius:

BluffdaleProvoOremSalt Lake CityLehiSandy

Are you Smart Wave Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

46 reviews

Verified Customer

10 August 2025
Verified Customer

Smart Wave Solar installed our panels quickly and professionally. The battery backup system has already proven its worth during a power outage. Great team to work with.

Verified Customer

15 May 2025
Verified Customer

Very satisfied with the installation and the customer service. The crew was punctual, clean, and thorough. Our energy bills have been cut by more than half.

Verified Customer

20 February 2025
Verified Customer

Good solar installation company with fair pricing. The design team maximized our roof space and the system is performing well through Utah's variable weather.

Frequently Asked Questions About Smart Wave Solar

What services does Smart Wave Solar offer?

Smart Wave Solar offers Solar Installation, Battery Storage.

Is Smart Wave Solar NABCEP certified?

Smart Wave Solar holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Smart Wave Solar serve?

Smart Wave Solar serves Bluffdale, Provo, Orem, Salt Lake City, Lehi, Sandy. They are based in Provo with a service radius of 80 km.

What warranty does Smart Wave Solar offer?

Smart Wave Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Smart Wave Solar's customer reviews?

Smart Wave Solar has a 4.7/5 rating based on 46 customer reviews. Customers consistently rate them highly.

How long has Smart Wave Solar been in business?

Smart Wave Solar was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Smart Wave Solar

Fill in your details and we'll connect you with Smart Wave Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote