Sol Luna Solar
Family-owned NABCEP-certified solar installer serving Santa Fe with 22+ MW of completed installations since 2012
14+
Years in Business
15
Customer Reviews
75 mi
Service Area
11-50
Employees
SurgePV Score
About Sol Luna Solar
Sol Luna Solar is a family-owned, full-service solar energy company with installation teams serving Santa Fe, Albuquerque, and Taos. Originally established as Los Ebanistas, Inc. in 1991, the company expanded into solar photovoltaic installations in 2012 and has since completed over 22 megawatts of solar PV across New Mexico.
Sol Luna Solar holds NABCEP certification and is licensed as both a general contractor and electrician in New Mexico. The company is majority women-owned and was selected as an approved installer for the Solarize Santa Fe program. Services include solar PV system design and installation, battery storage, EV charging stations, and ongoing maintenance and monitoring.
Sol Luna Solar serves residential, commercial, and utility-scale clients throughout northern New Mexico.
Service Area
Sol Luna Solar serves the following areas within a 75-mile radius:
Contact Information
Are you Sol Luna Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
15 reviews
Verified Customer
Sol Luna Solar handled our Santa Fe residential installation from design to commissioning. As a family-owned company, they provided personal attention and clear communication throughout.
Verified Customer
We chose Sol Luna for our commercial project after they were recommended through the Solarize Santa Fe program. The installation was completed on time and the system is producing above estimates.
Verified Customer
Professional installation team with good knowledge of local codes and permitting requirements. The battery storage addition was well-integrated with our existing electrical panel.
Frequently Asked Questions About Sol Luna Solar
What services does Sol Luna Solar offer?
Sol Luna Solar offers Solar Installation, Battery Storage, ev_charger, Maintenance.
Is Sol Luna Solar NABCEP certified?
Sol Luna Solar holds the following certifications: NABCEP Certified, Licensed General Contractor (NM), Licensed Electrician (NM). Contact them directly for the latest accreditation details.
What areas does Sol Luna Solar serve?
Sol Luna Solar serves Santa Fe, Albuquerque, Taos, Dixon, Espanola. They are based in Santa Fe with a service radius of 120 km.
What warranty does Sol Luna Solar offer?
Sol Luna Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Sol Luna Solar's customer reviews?
Sol Luna Solar has a 4.7/5 rating based on 15 customer reviews. Customers consistently rate them highly.
How long has Sol Luna Solar been in business?
Sol Luna Solar was founded in 2012 and has been in business for 14 years. They are one of the more experienced solar installers in their area.
Similar Installers in Santa Fe
Get a Free Solar Quote from Sol Luna Solar
Fill in your details and we'll connect you with Sol Luna Solar.
Quote request sent!
Sol Luna Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile