Solar by CIR
NYSERDA Quality Installer with over 1,400 solar installations and 20 MW installed capacity across Western New York since 2004
22+
Years in Business
1,400+
Projects Completed
10
Customer Reviews
62 mi
Service Area
51-200
Employees
SurgePV Score
About Solar by CIR
Solar by CIR is a solar division of CIR Electrical Construction Corp., headquartered at 2517 Long Road, Grand Island, NY 14072. The company began offering solar installation services in 2004 and has since completed over 1,400 installations with more than 20 MW of installed capacity across Western New York.
Solar by CIR holds NABCEP certification and is a two-time consecutive NYSERDA Quality Installer, making it the only local company in the WNY area to earn that distinction in back-to-back years. The company is frequently selected as the preferred solar installer for NYSERDA Solarize Campaigns.
Solar by CIR provides turnkey solar solutions for residential, commercial, industrial, and community clients across the Buffalo and Rochester metro areas. Services include system design, permitting, installation, energy-efficient lighting, and backup power systems.
Service Area
Solar by CIR serves the following areas within a 62-mile radius:
Contact Information
Are you Solar by CIR?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Inverters
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
10 reviews
Verified Customer
Solar by CIR handled everything from design to permitting and installation. The team was professional and the system has been performing above expectations since day one.
Verified Customer
Great experience with Solar by CIR. As a NYSERDA Quality Installer, they were able to guide us through all the available incentives and rebates. Highly recommend for WNY homeowners.
Verified Customer
Solid installation and good communication throughout the process. The crew was respectful of our property and cleaned up after themselves. System is generating as promised.
Frequently Asked Questions About Solar by CIR
What services does Solar by CIR offer?
Solar by CIR offers Solar Installation, Battery Storage, Solar Design, Maintenance, Grid Connection.
Is Solar by CIR NABCEP certified?
Solar by CIR holds the following certifications: NABCEP Certified, NYSERDA Quality Installer. Contact them directly for the latest accreditation details.
What areas does Solar by CIR serve?
Solar by CIR serves Buffalo, Rochester, Grand Island, Niagara Falls, Tonawanda, Amherst. They are based in Buffalo with a service radius of 100 km.
What warranty does Solar by CIR offer?
Solar by CIR offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Solar by CIR's customer reviews?
Solar by CIR has a 4.7/5 rating based on 10 customer reviews. Customers consistently rate them highly.
How long has Solar by CIR been in business?
Solar by CIR was founded in 2004 and has been in business for 22 years. They are one of the more experienced solar installers in their area.
Similar Installers in Buffalo
Get a Free Solar Quote from Solar by CIR
Fill in your details and we'll connect you with Solar by CIR.
Quote request sent!
Solar by CIR will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile