Solar Direct
Sarasota-based solar installers since 1986 with NABCEP certification and thousands of completed installations
40+
Years in Business
22
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About Solar Direct
Solar Direct is a certified and licensed solar installation company headquartered at 6935 15th St E, Suite 120, Sarasota, FL 34243. Founded in 1986, the company is one of the longest-operating solar installers in Florida, with thousands of completed residential and commercial installations across the state.
The company is a fully licensed engineering firm with NABCEP certifications and holds a BBB A+ rating. Solar Direct handles the full scope of solar projects including system design, permitting, installation of panels, inverters, and battery storage, as well as ongoing maintenance and service support. The service department can be reached at (941) 263-7694 for existing system issues.
Solar Direct holds a 4.2-star rating on Angi and has 22 reviews on Yelp. Customers note the company’s decades of Florida-specific solar experience and professional installation crews. The company operates Monday through Friday from 9:00 AM to 5:00 PM.
Service Area
Solar Direct serves the following areas within a 62-mile radius:
Contact Information
Are you Solar Direct?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.2
22 reviews
Verified Customer
The installation process was smooth and completed within two months. All questions were answered promptly via email. Very satisfied with the system performance.
Verified Customer
Good overall experience with Solar Direct. The team was knowledgeable and the installation was professional. System has been running well since day one.
Verified Customer
Have been using Solar Direct for years. Their service department is responsive and the system continues to perform above expectations. Highly recommend.
Frequently Asked Questions About Solar Direct
What services does Solar Direct offer?
Solar Direct offers Solar Installation, Battery Storage, Maintenance.
Is Solar Direct NABCEP certified?
Yes, Solar Direct is NABCEP certified and also holds BBB A+ Rating certification. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Solar Direct serve?
Solar Direct serves Sarasota, Bradenton, Venice, North Port, Lakewood Ranch, Osprey. They are based in Sarasota with a service radius of 100 km.
What warranty does Solar Direct offer?
Solar Direct offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Solar Direct's customer reviews?
Solar Direct has a 4.2/5 rating based on 22 customer reviews. They are well-regarded by their customers.
How long has Solar Direct been in business?
Solar Direct was founded in 1986 and has been in business for 40 years. They are one of the more experienced solar installers in their area.
Similar Installers in Sarasota
Get a Free Solar Quote from Solar Direct
Fill in your details and we'll connect you with Solar Direct.
Quote request sent!
Solar Direct will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile