SE

Solar Energy Labs

Jacksonville's oldest solar provider since 1973, with over 50 years of installation and service experience

Jacksonville, Florida
4.5 (15 reviews)
Verified
Residential Commercial

53+

Years in Business

0

15

Customer Reviews

62 mi

Service Area

1-10

Employees

SurgePV Score

8.5 / 10
Customer Reviews
90%
Certifications
75%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About Solar Energy Labs

Solar Energy Labs is Jacksonville’s oldest solar provider, formed in 1973 by CEO Michael Newman. The company operates from 1057 Ellis Road North, Suite 17, in Jacksonville and also maintains facilities at 5191 Shawland Road. With over 50 years in the solar industry, Solar Energy Labs is a State Certified Solar Power contractor holding Florida license CVC56672, which expires in August 2026.

The company sells, installs, and services all types of solar energy systems that employ photovoltaic solar panels for both residential and commercial customers. Solar Energy Labs installs Qcells and Canadian Solar panels with Enphase and SolarEdge inverters, paired with Tesla Powerwall and Enphase IQ battery storage systems. The company also provides battery backup solutions and system monitoring services.

Solar Energy Labs is BBB Accredited and has built a customer base spanning five decades of continuous service in Northeast Florida. The company’s long tenure in the Jacksonville market means deep familiarity with local permitting requirements, utility interconnection processes, and the specific solar conditions of the region. Solar Energy Labs serves Jacksonville, Orange Park, St. Augustine, Jacksonville Beach, Fernandina Beach, and Ponte Vedra Beach. Business hours are Monday through Friday, 8 AM to 5 PM.

Service Area

Solar Energy Labs serves the following areas within a 62-mile radius:

JacksonvilleOrange ParkSt. AugustineJacksonville BeachFernandina BeachPonte Vedra Beach

Are you Solar Energy Labs?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Maintenance
Grid Connection

Certifications & Accreditations

BBB Accredited FL Certified Solar Contractor CVC56672

Partner Manufacturers

Panels

QcellsCanadian Solar

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

15 reviews

Harold B.

18 August 2025
Verified Customer

Solar Energy Labs has been in business for decades and the experience shows in their workmanship. Mike and his team designed a system that fit our budget and energy goals perfectly. Solid local company.

Janet R.

22 May 2025
Verified Customer

We chose Solar Energy Labs based on their long history in Jacksonville. The installation was efficient and the system has been reliable. They also service systems from other installers, which shows their breadth of knowledge.

Victor M.

10 February 2025
Verified Customer

Professional installation and good follow-up service. The team was knowledgeable about the latest panel technology while drawing on decades of field experience. A dependable choice in Jacksonville.

Frequently Asked Questions About Solar Energy Labs

What services does Solar Energy Labs offer?

Solar Energy Labs offers Solar Installation, Battery Storage, Solar Design, Maintenance, Grid Connection.

Is Solar Energy Labs NABCEP certified?

Solar Energy Labs holds the following certifications: BBB Accredited, FL Certified Solar Contractor CVC56672. Contact them directly for the latest accreditation details.

What areas does Solar Energy Labs serve?

Solar Energy Labs serves Jacksonville, Orange Park, St. Augustine, Jacksonville Beach, Fernandina Beach, Ponte Vedra Beach. They are based in Jacksonville with a service radius of 100 km.

What warranty does Solar Energy Labs offer?

Solar Energy Labs offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Solar Energy Labs's customer reviews?

Solar Energy Labs has a 4.5/5 rating based on 15 customer reviews. Customers consistently rate them highly.

How long has Solar Energy Labs been in business?

Solar Energy Labs was founded in 1973 and has been in business for 53 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Solar Energy Labs

Fill in your details and we'll connect you with Solar Energy Labs.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote