SE

Solar Energy Solutions

Indiana's oldest and most experienced local solar installer, family-owned since 2006

Indianapolis, Indiana
4.7 (50 reviews)
Verified
Residential Commercial

20+

Years in Business

50

Customer Reviews

124 mi

Service Area

11-50

Employees

SurgePV Score

8.6 / 10
Customer Reviews
94%
Certifications
60%
Experience
100%
Services Range
100%
Warranty Coverage
80%
Online Presence
75%

About Solar Energy Solutions

Solar Energy Solutions is a family-owned solar installation company founded in 2006, making it the oldest and most experienced solar installer in the Indiana region. The company operates an Indianapolis office at 5813 W 73rd St and serves homeowners and businesses across Indiana, Illinois, Kentucky, Ohio, and Virginia. SES has built a reputation for quality installations backed by nearly two decades of operational experience.

The company provides full-service residential and commercial solar installations, including system design, engineering, permitting, installation, battery storage, and long-term monitoring. Solar Energy Solutions works with leading equipment manufacturers and offers NABCEP-certified installation professionals on every project. The team handles all aspects of the solar process from initial energy assessment through utility interconnection and ongoing system support.

Solar Energy Solutions maintains strong customer ratings, with homeowners praising the company’s expertise, honesty, and meticulous attention to installation quality. The company’s nearly 20-year track record provides customers with confidence in warranty support and long-term service. SES offers standard 25-year product warranties and workmanship coverage on all installations.

Service Area

Solar Energy Solutions serves the following areas within a 124-mile radius:

IndianapolisEvansvilleBloomingtonCarmelFishersGreenwoodNoblesvilleTerre Haute

Are you Solar Energy Solutions?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Commercial Solar
Maintenance
Monitoring

Certifications & Accreditations

NABCEP

Partner Manufacturers

Inverters

EnphaseSolarEdge

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

50 reviews

Nancy W.

5 June 2025
Verified Customer

SES installed our system last spring and it has been performing above projections. They were meticulous with the installation and very patient in explaining the monitoring system. Highly recommend this local company.

Paul J.

15 January 2025
Verified Customer

We went with Solar Energy Solutions because they have been around since 2006. Their experience showed in every phase of the project. Professional, honest, and fair pricing. Our electricity bill is nearly zero.

Michelle T.

20 September 2024
Verified Customer

Good company with knowledgeable staff. The design process was thorough and the installation crew did clean work. Minor communication gap during permitting but the end result was worth it.

Frequently Asked Questions About Solar Energy Solutions

What services does Solar Energy Solutions offer?

Solar Energy Solutions offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Commercial Solar, Maintenance, Monitoring.

Is Solar Energy Solutions NABCEP certified?

Yes, Solar Energy Solutions is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Solar Energy Solutions serve?

Solar Energy Solutions serves Indianapolis, Evansville, Bloomington, Carmel, Fishers, Greenwood, Noblesville, Terre Haute. They are based in Indianapolis with a service radius of 200 km.

What warranty does Solar Energy Solutions offer?

Solar Energy Solutions offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Solar Energy Solutions's customer reviews?

Solar Energy Solutions has a 4.7/5 rating based on 50 customer reviews. Customers consistently rate them highly.

How long has Solar Energy Solutions been in business?

Solar Energy Solutions was founded in 2006 and has been in business for 20 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Solar Energy Solutions

Fill in your details and we'll connect you with Solar Energy Solutions.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote