Solar King
Michigan-born solar installer delivering customized residential and commercial solutions in Metro Detroit
7+
Years in Business
250+
Projects Completed
30
Customer Reviews
50 mi
Service Area
1-10
Employees
SurgePV Score
About Solar King
Solar King is a locally owned solar installation company based in Commerce Township, Michigan, founded by Don King. After more than 22 years in the automotive industry, King launched Solar King to help Michigan residents and businesses transition to solar energy. The company specializes in customized solar panel installations for both residential and commercial properties throughout the Metro Detroit area and Oakland County.
Solar King provides end-to-end solar services including site evaluation, system design, permitting, professional installation, and monitoring setup. As a smaller, owner-operated company, Solar King offers a personalized approach where clients work directly with the owner throughout the project. The company designs each system based on the specific energy consumption patterns, roof characteristics, and budget of the homeowner.
Operating from Commerce Township in Oakland County, Solar King primarily serves the western suburbs of Detroit including Novi, Walled Lake, Farmington Hills, West Bloomfield, and Milford. The company has built its reputation on transparent pricing, honest consultations, and quality workmanship. Customer reviews consistently note the hands-on service and straightforward communication that comes with working with a locally owned business.
Service Area
Solar King serves the following areas within a 50-mile radius:
Contact Information
Are you Solar King?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
30 reviews
Paul A.
Don at Solar King took the time to explain every aspect of the system design and what we could expect for production. No high-pressure sales tactics, just honest information. The installation was clean and our system has been running great for four months.
Michelle R.
Solar King was responsive and professional throughout the entire process. They handled the design, permitting, and installation without any issues. Our energy bill has dropped from $250 to about $30. Very satisfied with our decision.
Andrew C.
Good local company with personalized service. Don clearly cares about doing the job right. The system is producing as expected. Being a smaller company, scheduling can take a bit longer during busy months.
Frequently Asked Questions About Solar King
What services does Solar King offer?
Solar King offers Solar Installation, Battery Storage, Solar Design, Monitoring.
Is Solar King NABCEP certified?
Solar King holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Solar King serve?
Solar King serves Detroit, Commerce Township, Novi, Walled Lake, Farmington Hills, West Bloomfield, Bloomfield Hills, Milford and 2 other areas. They are based in Detroit with a service radius of 80 km.
What warranty does Solar King offer?
Solar King offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Solar King's customer reviews?
Solar King has a 4.7/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has Solar King been in business?
Solar King was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.
Similar Installers in Detroit
Get a Free Solar Quote from Solar King
Fill in your details and we'll connect you with Solar King.
Quote request sent!
Solar King will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile