SL

Solar Luxury LLC

Custom solar panel installations in St. Louis since 2014, with dedicated in-house design and tech support

St. Louis, Missouri
4.7 (40 reviews)
Verified
Residential

12+

Years in Business

0

40

Customer Reviews

62 mi

Service Area

1-10

Employees

SurgePV Score

8.2 / 10
Customer Reviews
94%
Certifications
60%
Experience
85%
Services Range
90%
Warranty Coverage
80%
Online Presence
75%

About Solar Luxury LLC

Solar Luxury LLC is a locally owned solar installation company based in St. Louis that has been designing and installing custom solar panel systems since 2014. Founded by Tyler LeMay, the company focuses on residential solar installations tailored to each homeowner’s specific roof layout, energy usage, and budget. Solar Luxury is BBB-accredited and operates from its office at 11252 Midland Boulevard in the Overland area.

The company provides end-to-end solar services including site assessment, system design, installation, permitting, and utility interconnection. Solar Luxury also offers system repair services for existing solar installations, regardless of the original installer. The company maintains a dedicated tech support line for customers who need assistance with their systems after installation.

Solar Luxury serves homeowners across St. Louis City, St. Louis County, St. Charles County, and surrounding communities in the metro area. The company provides free consultations and works with customers to identify financing options that fit their budget. All installations include manufacturer warranties on panels and inverters, plus a workmanship warranty from Solar Luxury.

Service Area

Solar Luxury LLC serves the following areas within a 62-mile radius:

St. LouisOverlandCreve CoeurSt. CharlesFlorissantBridgetonMaryland Heights

Are you Solar Luxury LLC?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Maintenance
system_repairs
Energy Audit

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

40 reviews

David L.

28 July 2025
Verified Customer

Tyler and the team at Solar Luxury designed a system that fit our roof perfectly. The installation was completed in one day and the crew was courteous and professional. Our energy bills dropped significantly in the first month.

Jennifer K.

15 April 2025
Verified Customer

We had a great experience with Solar Luxury. They were transparent about costs and timeline from the beginning. The system is producing well and their tech support team was quick to help us set up monitoring.

Richard T.

20 January 2025
Verified Customer

Solid work from a local company. The installation went smoothly and the panels are performing as promised. The only minor issue was a scheduling delay, but the quality of the final product was worth the wait.

Frequently Asked Questions About Solar Luxury LLC

What services does Solar Luxury LLC offer?

Solar Luxury LLC offers Solar Installation, Solar Design, Maintenance, system_repairs, Energy Audit.

Is Solar Luxury LLC NABCEP certified?

Solar Luxury LLC holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Solar Luxury LLC serve?

Solar Luxury LLC serves St. Louis, Overland, Creve Coeur, St. Charles, Florissant, Bridgeton, Maryland Heights. They are based in St. Louis with a service radius of 100 km.

What warranty does Solar Luxury LLC offer?

Solar Luxury LLC offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Solar Luxury LLC's customer reviews?

Solar Luxury LLC has a 4.7/5 rating based on 40 customer reviews. Customers consistently rate them highly.

How long has Solar Luxury LLC been in business?

Solar Luxury LLC was founded in 2014 and has been in business for 12 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Solar Luxury LLC

Fill in your details and we'll connect you with Solar Luxury LLC.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote