Solar Path
Award-winning Tucson solar installer with NABCEP and LEED certifications serving Southern Arizona
21+
Years in Business
15
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About Solar Path
Solar Path is a Tucson-area solar installation company located at 8339 N Oracle Rd Suite 110, in the Oracle Design Studios near Oro Valley. The company holds dual NABCEP and LEED certifications, a combination that reflects its focus on both solar installation quality and broader sustainable building practices. Solar Path serves residential and commercial customers across Southern Arizona with a comprehensive range of solar services.
The company takes an engineering-driven approach to solar design, beginning every project with a detailed energy analysis and feasibility study. Solar Path’s services span system design and engineering, panel selection, construction management, installation, performance monitoring, and ongoing maintenance programs. Their LEED certification makes them a strong choice for commercial projects seeking green building credits or sustainability benchmarks.
Solar Path has built a loyal customer base over its years of operation in the Tucson area, with customers highlighting the company’s thorough design process and attention to site-specific conditions like shading and roof orientation. The company operates Monday through Thursday with a half day on Fridays, and offers 25-year manufacturer warranties on panels and inverters alongside a 10-year workmanship guarantee on all installations.
Service Area
Solar Path serves the following areas within a 62-mile radius:
Contact Information
Are you Solar Path?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
15 reviews
George T.
Solar Path designed and installed a 12 kW system on our Oro Valley home. Their NABCEP and LEED certifications gave us confidence in the technical design. The system has been performing above projections since day one.
Nancy H.
We chose Solar Path for their engineering approach to solar design. They conducted a thorough energy analysis before recommending a system size. The installation was clean and the crew was professional throughout.
Roger B.
Solid local company with good technical knowledge. They designed a system that accounts for our partial shading issues. Installation was completed on schedule and the monitoring system works well.
Frequently Asked Questions About Solar Path
What services does Solar Path offer?
Solar Path offers Solar Installation, Battery Storage, Maintenance, Monitoring, Energy Audit, Commercial Solar.
Is Solar Path NABCEP certified?
Yes, Solar Path is NABCEP certified and also holds LEED, ROC Licensed certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Solar Path serve?
Solar Path serves Tucson, Oro Valley, Marana, Sahuarita, Green Valley, Catalina. They are based in Tucson with a service radius of 100 km.
What warranty does Solar Path offer?
Solar Path offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Solar Path's customer reviews?
Solar Path has a 4.5/5 rating based on 15 customer reviews. Customers consistently rate them highly.
How long has Solar Path been in business?
Solar Path was founded in 2005 and has been in business for 21 years. They are one of the more experienced solar installers in their area.
Similar Installers in Tucson
Get a Free Solar Quote from Solar Path
Fill in your details and we'll connect you with Solar Path.
Quote request sent!
Solar Path will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile