SP

Solar Pathways

Fort Collins solar and electrical contractor providing residential and commercial solar design, installation, and battery backup systems

Fort Collins, Colorado
4.9 (25 reviews)
Verified
Residential Commercial

5+

Years in Business

0

25

Customer Reviews

50 mi

Service Area

2-10

Employees

SurgePV Score

8.2 / 10
Customer Reviews
98%
Certifications
60%
Experience
70%
Services Range
90%
Warranty Coverage
80%
Online Presence
100%

About Solar Pathways

Solar Pathways Energy & Electrical is a solar and electrical contracting company based at 155 E. Boardwalk Drive, Suite 507, in Fort Collins, Colorado. Founded in 2021, the company provides residential and commercial solar energy system design, installation, and electrical services throughout Northern Colorado.

In addition to solar panel installation, Solar Pathways offers battery backup systems, EV charger installation, service panel upgrades, and general electrical work for remodels and new construction. The company’s licensed and insured electricians have completed installations for thousands of residential and commercial customers in the Fort Collins area.

Solar Pathways maintains a 4.9-star rating on HomeAdvisor, with customers consistently praising the team’s professionalism, responsiveness, and quality of work. The company operates extended hours Monday through Friday from 7 AM to 8 PM and weekends from 8 AM to 5 PM.

Service Area

Solar Pathways serves the following areas within a 50-mile radius:

Fort CollinsLovelandGreeleyWindsorWellington

Are you Solar Pathways?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Solar Design
Grid Connection

Certifications & Accreditations

Colorado Contractor License

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

25 reviews

Chris W.

1 December 2025
Verified Customer

Solar Pathways designed and installed our 10 kW system in just a few weeks. The crew was professional and left the job site spotless. Highly recommend.

Amanda P.

10 September 2025
Verified Customer

Great experience from initial consultation through installation. They also upgraded our electrical panel and installed an EV charger at the same time.

Robert J.

5 July 2025
Verified Customer

Responsive, fair pricing, and quality work. Solar Pathways handled the entire process including permitting and utility coordination.

Frequently Asked Questions About Solar Pathways

What services does Solar Pathways offer?

Solar Pathways offers Solar Installation, Battery Storage, EV Charging, Solar Design, Grid Connection.

Is Solar Pathways NABCEP certified?

Solar Pathways holds the following certifications: Colorado Contractor License. Contact them directly for the latest accreditation details.

What areas does Solar Pathways serve?

Solar Pathways serves Fort Collins, Loveland, Greeley, Windsor, Wellington. They are based in Fort Collins with a service radius of 80 km.

What warranty does Solar Pathways offer?

Solar Pathways offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Solar Pathways's customer reviews?

Solar Pathways has a 4.9/5 rating based on 25 customer reviews. Customers consistently rate them highly.

How long has Solar Pathways been in business?

Solar Pathways was founded in 2021 and has been in business for 5 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Solar Pathways

Fill in your details and we'll connect you with Solar Pathways.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote