SS

Solar Solution AZ

Tucson's top local solar installer with over 3,000 systems completed and NABCEP certification

Tucson, Arizona
4.3 (43 reviews)
Verified
Residential Commercial

14+

Years in Business

3,000+

Projects Completed

43

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

8.8 / 10
Customer Reviews
86%
Certifications
90%
Experience
85%
Services Range
90%
Warranty Coverage
100%
Online Presence
75%

About Solar Solution AZ

Solar Solution AZ is a Tucson-based solar installation company founded in 2012, operating from 3219 E 45th Street. The company has completed over 3,000 solar panel installations across Southern Arizona, making it one of the most experienced local installers in the Tucson market. Solar Solution AZ holds NABCEP certification and an A+ rating from the BBB, reflecting their commitment to industry standards and customer satisfaction.

The company specializes in both rooftop and ground-mount solar systems for residential and commercial customers. Solar Solution AZ has particular expertise with the variety of roof types common in Tucson, including clay tile, concrete tile, shingle, metal, foam, and coated surfaces. Their team handles every phase of the project from initial roof assessment and system design through permitting, installation, and utility interconnection.

Solar Solution AZ averages 4.3 stars from 43 reviews on Yelp and offers one of the strongest warranty packages in the Tucson market: 25 years covering panels, inverters, workmanship, roof penetrations, and production guarantees. This comprehensive warranty structure protects homeowners for the full expected lifespan of their solar system. Customers note the company’s competitive pricing and efficient installation timelines as key strengths.

Service Area

Solar Solution AZ serves the following areas within a 50-mile radius:

TucsonOro ValleyMaranaSahuaritaGreen ValleyVailCatalina

Are you Solar Solution AZ?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Monitoring
Roof Assessment

Certifications & Accreditations

NABCEP BBB A+ Rated ROC Licensed

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

25 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.3

43 reviews

Michelle P.

30 August 2025
Verified Customer

Solar Solution AZ installed a system on our clay tile roof without any issues. Their experience with different roof types in Tucson really shows. System is performing exactly as quoted and our bills have dropped dramatically.

Robert G.

18 April 2025
Verified Customer

Good company with a lot of local installations under their belt. The team was professional and completed the work efficiently. The 25-year warranty on everything gives us long-term confidence in the investment.

Elizabeth H.

10 December 2024
Verified Customer

We chose Solar Solution for their long track record in Tucson. The installation went smoothly and the system has been reliable. Communication was good, though there was some back and forth on the final design.

Frequently Asked Questions About Solar Solution AZ

What services does Solar Solution AZ offer?

Solar Solution AZ offers Solar Installation, Battery Storage, Maintenance, Monitoring, Roof Assessment.

Is Solar Solution AZ NABCEP certified?

Yes, Solar Solution AZ is NABCEP certified and also holds BBB A+ Rated, ROC Licensed certifications. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Solar Solution AZ serve?

Solar Solution AZ serves Tucson, Oro Valley, Marana, Sahuarita, Green Valley, Vail, Catalina. They are based in Tucson with a service radius of 80 km.

What warranty does Solar Solution AZ offer?

Solar Solution AZ offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.

How are Solar Solution AZ's customer reviews?

Solar Solution AZ has a 4.3/5 rating based on 43 customer reviews. They are well-regarded by their customers.

How long has Solar Solution AZ been in business?

Solar Solution AZ was founded in 2012 and has been in business for 14 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Solar Solution AZ

Fill in your details and we'll connect you with Solar Solution AZ.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote