Solar Topps
NABCEP-certified solar engineering firm delivering premium installations at competitive prices since 2009
17+
Years in Business
380
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Solar Topps
Solar Topps is a NABCEP-certified solar engineering firm based in Phoenix that has been designing and installing solar energy systems since 2009. The company specializes in rooftop, ground-mount, and shade structure solar systems for both residential and commercial customers. Solar Topps was named EnergySage’s 2025 Local Installer of the Year for Arizona, reflecting their strong customer satisfaction and competitive pricing.
As a Tesla Certified Installer, Enphase Gold Installer, and REC Certified Solar Professional, Solar Topps works with well-established equipment brands that homeowners and businesses trust. Their engineering team handles custom system design using detailed roof modeling and production analysis, while their in-house crews manage all installation work. The company also provides battery backup solutions and EV charging station installations.
Solar Topps holds a 4.6-star rating across 380 reviews on Birdeye and maintains strong ratings on EnergySage, Google, and Yelp. Customers regularly cite competitive pricing, professional installation quality, and responsive communication as the company’s strengths. The company offers a 25-year warranty covering panels, inverters, and workmanship, giving customers comprehensive long-term coverage.
Service Area
Solar Topps serves the following areas within a 50-mile radius:
Contact Information
Are you Solar Topps?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
25 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.6
380 reviews
Mark D.
Solar Topps delivered exactly what they promised. The engineering team designed a system that maximizes our south-facing roof space, and the installation crew was done in a single day. Our first full month showed 15% more production than estimated.
Angela S.
We got quotes from five companies and Solar Topps offered the best value without cutting corners on equipment. They use REC panels and Enphase microinverters, which is exactly what we wanted. Professional from start to finish.
Chris B.
Very satisfied with the installation quality and pricing. The team was knowledgeable and answered all my technical questions. The only hiccup was a short scheduling delay, but they kept us informed the whole time.
Frequently Asked Questions About Solar Topps
What services does Solar Topps offer?
Solar Topps offers Solar Installation, Battery Storage, EV Charging, Solar Design, Maintenance, Monitoring, Grid Connection.
Is Solar Topps NABCEP certified?
Yes, Solar Topps is NABCEP certified and also holds Tesla Certified Installer, Enphase Gold Installer, REC Certified Solar Professional, BBB Accredited certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Solar Topps serve?
Solar Topps serves Phoenix, Scottsdale, Tempe, Mesa, Chandler, Gilbert, Glendale, Peoria and 1 other areas. They are based in Phoenix with a service radius of 80 km.
What warranty does Solar Topps offer?
Solar Topps offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.
How are Solar Topps's customer reviews?
Solar Topps has a 4.6/5 rating based on 380 customer reviews. Customers consistently rate them highly.
How long has Solar Topps been in business?
Solar Topps was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Phoenix
Get a Free Solar Quote from Solar Topps
Fill in your details and we'll connect you with Solar Topps.
Quote request sent!
Solar Topps will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile