SU

Solartime USA

Family-owned DFW solar company with over 29,000 installations since 2009

Fort Worth, Texas
4.9 (150 reviews)
Residential Commercial

17+

Years in Business

29,000+

Projects Completed

150

Customer Reviews

50 mi

Service Area

51-200

Employees

SurgePV Score

7 / 10
Customer Reviews
98%
Certifications
0%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
75%

About Solartime USA

Solartime USA is a family-owned solar installation company founded in 2009 and headquartered at 1758 Firman Dr, Suite 100, Richardson, TX 75081. The company serves the entire Dallas-Fort Worth area and has completed over 29,000 solar installations, making it one of the most experienced solar contractors in North Texas.

Solartime USA holds an A+ rating with the Better Business Bureau and maintains consistent five-star Google reviews. The company provides solar panel installation, battery storage systems, and EV charger installation for residential and commercial customers. Their team handles the complete process from initial consultation and system design through permitting, installation, and utility interconnection.

The company prides itself on its family-first approach to business, with founder Paul leading the operation since 2009. Solartime USA is recognized as one of the highest-rated and most trusted solar companies in the DFW area, with a strong emphasis on competitive pricing and responsive customer communication throughout every project.

Service Area

Solartime USA serves the following areas within a 50-mile radius:

Fort WorthDallasRichardsonPlanoArlington

Are you Solartime USA?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

150 reviews

Angela D.

8 November 2025
Verified Customer

Solartime USA was a pleasure to work with from start to finish. The team was upfront about costs, timeline, and what to expect. Our electric bill dropped significantly.

Robert C.

14 September 2025
Verified Customer

Very impressed with the professionalism and speed of installation. The family-owned feel really shows in their customer service. Highly recommend.

Linda M.

22 July 2025
Verified Customer

Great experience overall. They handled all the paperwork and permitting. The installation crew was efficient and left our property spotless.

Frequently Asked Questions About Solartime USA

What services does Solartime USA offer?

Solartime USA offers Solar Installation, Battery Storage, EV Charging.

Is Solartime USA NABCEP certified?

Solartime USA holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Solartime USA serve?

Solartime USA serves Fort Worth, Dallas, Richardson, Plano, Arlington. They are based in Fort Worth with a service radius of 80 km.

What warranty does Solartime USA offer?

Solartime USA offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Solartime USA's customer reviews?

Solartime USA has a 4.9/5 rating based on 150 customer reviews. Customers consistently rate them highly.

How long has Solartime USA been in business?

Solartime USA was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Solartime USA

Fill in your details and we'll connect you with Solartime USA.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote