SS

SolaTrue St. Louis

Locally owned solar franchise in Pacific, MO serving the greater St. Louis area with Enphase-backed residential installations

St. Louis, Missouri
4.8 (25 reviews)
Verified
Residential

6+

Years in Business

0

25

Customer Reviews

75 mi

Service Area

1-10

Employees

SurgePV Score

8.4 / 10
Customer Reviews
96%
Certifications
75%
Experience
70%
Services Range
90%
Warranty Coverage
100%
Online Presence
75%

About SolaTrue St. Louis

SolaTrue St. Louis is a locally owned and operated solar franchise run by Kevin and Denise Brauer, serving the greater St. Louis metro area from their office at 116 East Orleans Street in Pacific, Missouri. The Brauer family has deep roots in the St. Louis community, having lived and worked in the area for over 20 years. SolaTrue combines local ownership with the national resources and support of the SolaTrue franchise network.

The company specializes in residential solar installations, including rooftop systems, ground-mounted arrays, home generators, backup battery systems, and EV chargers. SolaTrue works with Enphase microinverters and battery systems, which come with a 25-year manufacturer warranty. All installations include a workmanship warranty and the company’s certified solar installers are trained to provide ethical, turnkey service from start to finish.

SolaTrue St. Louis serves a wide area including St. Louis County, Franklin County, St. Charles County, Warren County, Jefferson County, Gasconade County, and Crawford County. Cities served include Ballwin, Chesterfield, Creve Coeur, St. Charles, St. Peters, Wentzville, Troy, Sunset Hills, Fenton, Arnold, Eureka, Festus, Washington, and Union. The company offers free solar consultations and handles all permitting and utility interconnection on behalf of the homeowner.

Service Area

SolaTrue St. Louis serves the following areas within a 75-mile radius:

St. LouisPacificWashingtonUnionEurekaBallwinChesterfieldSt. CharlesWentzvilleFestus

Are you SolaTrue St. Louis?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Grid Connection

Certifications & Accreditations

BBB Accredited Enphase Certified

Partner Manufacturers

Inverters

Enphase

Batteries

Enphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

25 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

25 reviews

Larry K.

12 September 2025
Verified Customer

Kevin and the SolaTrue team were excellent to work with. They explained the process clearly and handled all the paperwork. Our system was up and running within six weeks of signing the contract. Production has exceeded estimates.

Nancy P.

5 June 2025
Verified Customer

We appreciated working with a locally owned company that has national support behind them. The installation crew was professional and efficient. Our electric bill went from $200 to under $25 in the first full month.

Tim R.

18 March 2025
Verified Customer

Good experience from consultation to installation. The Enphase microinverters and monitoring app make it easy to track our system performance. The only minor delay was waiting for the utility inspection, but SolaTrue kept us updated.

Frequently Asked Questions About SolaTrue St. Louis

What services does SolaTrue St. Louis offer?

SolaTrue St. Louis offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection.

Is SolaTrue St. Louis NABCEP certified?

SolaTrue St. Louis holds the following certifications: BBB Accredited, Enphase Certified. Contact them directly for the latest accreditation details.

What areas does SolaTrue St. Louis serve?

SolaTrue St. Louis serves St. Louis, Pacific, Washington, Union, Eureka, Ballwin, Chesterfield, St. Charles and 2 other areas. They are based in St. Louis with a service radius of 120 km.

What warranty does SolaTrue St. Louis offer?

SolaTrue St. Louis offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.

How are SolaTrue St. Louis's customer reviews?

SolaTrue St. Louis has a 4.8/5 rating based on 25 customer reviews. Customers consistently rate them highly.

How long has SolaTrue St. Louis been in business?

SolaTrue St. Louis was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.

Get a Free Solar Quote from SolaTrue St. Louis

Fill in your details and we'll connect you with SolaTrue St. Louis.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote